Manager, Battery Engineering Updated On Thu, Feb 24th, 2022 by Saurenergy The Manager, Battery Engineering will lead a team of engineers that perform hardware and software integration of battery systems with Fluence core products. Typical tasks and initiatives performed by the Battery Engineering team include: Provide technical leadership in collaborative process with Product Managers to determine allowable product configurations and future battery controls architecture. Responsible for […] Read more
Senior Electrical Engineer – Product Design Updated On Thu, Feb 24th, 2022 by Saurenergy Responsibilities:- Develop electrical design of Fluence battery system products from conceptual stage to final design, testing, and manufacturing while meeting difficult requirements for size, environmental conditions, maintainability, reliability, long lifetime, and cost. Define design, construction, operation and maintenance goals for products. Acquire in-depth knowledge of industry standards related to safe battery storage system design, including […] Read more
Consultancy Tender Issued for Solar Plant at Embassy of India, Brasilia Updated On Wed, Feb 23rd, 2022 by Saurenergy The President of India, acting through the Embassy of India in Brasilia, Brazil, has invited proposals from eligible contractors for the installation of a solar energy system in the Chancery Complex of the Embassy on a turnkey/design and build basis. The last date to submit sealed bids is is March 14, 2022, till 5 PM. […] Read more
CERC Notifies Draft Regulations 2022 for Issuance of RECs Updated On Wed, Feb 23rd, 2022 by Saurenergy The Central Electricity Regulatory Commission (CERC) has notified Draft Regulations, 2022, for the issuance of renewable energy certificates (RECs), which are aimed at developing the renewable power market. CERC has invited comments, suggestions, and objections from the relevant stakeholders and interested persons with respect to the Draft Regulations. The responses are to be sent on […] Read more
Design Engineer/Project Engineer: NPD-PT Updated On Wed, Feb 23rd, 2022 by Saurenergy As a member of an engineering team, the Project engineer contributes to the development of products. The development must be done in accordance with the applicable procedures and ensure compliance with the main specification requirements in all aspects (product functionality and quality, development timing & cost, execution costs). Within this mission, the design engineer will […] Read more
Hardware Engineer- Electrical testing Updated On Wed, Feb 23rd, 2022 by Saurenergy Major Responsibilities:- Design and Redesign of tester cards, Programming of FPGA, Tester E-Plan Creation, Installation/Upgradation and Commissioning of new Test equipment, HW devices, Tools and Test servers, Process Setup/Improvements, Test program generation for existing and newly launched products, Testers problem troubleshooting support. In case of necessity maintain and document HW parts of tester or complete […] Read more
Qatar’s First Solar Plant to Use 800 MW of LONGi’s Bifacial Modules Updated On Wed, Feb 23rd, 2022 by Saurenergy Located to the west of Doha over an area of 10 km2, the Al-Kharsaa project is the first solar power plant in Qatar, with a total planned power generation capacity of 800MW. The project will be equipped with Chinese manufacturer LONGi’s Hi-MO 4 bifacial modules and a tracking system. The company claims that this will […] Read more
Azure Power refinances its 600 MW solar project Updated On Wed, Feb 23rd, 2022 by Saurenergy Azure Power Global Limited has said that it has refinanced its 600 MW solar power project – which is based in the state of Rajasthan – at the lowest rate of interest in its portfolio up to the present time. The company statement says that it has successfully refinanced its existing project finance facility of […] Read more
LG Electronics to Exit Global Solar Panel Business Updated On Wed, Feb 23rd, 2022 by Saurenergy LG Electronics Inc. is exiting the global solar panel business. The decision, approved Feb. 22 by the LG board of directors in South Korea, follows a comprehensive review of the impact of increasing material and logistics costs, as well as severe supply constraints, on the solar business, the company has said in a statement. Although […] Read more