Solar Capacity Additions Continue to Slow Down, July 2022 Records Barely 270 MW Updated On Thu, Aug 18th, 2022 by Saurenergy In July 2022, India added 268.06 MW of solar capacity which is 66.03% less than what India added in June 2022. If we see the total solar capacity added in July 2021, it’s 1604.63 MW. Comparing it with this year in the same period, it’s almost 83% less than the previous year. The rise in […] Read more
Toyota Research Institute & Northwestern Unite To Aid World’s First Nanomaterial Data Factory Updated On Thu, Aug 18th, 2022 by Saurenergy Toyota Research Institute (TRI) and Northwestern University have joined hands to aid the acceleration of new materials discovery, design and development with the world’s first nanomaterial “data factory.” This methodology, driven by artificial intelligence, greatly transcends the standard trial and error through the exploration of extensive parameter sets, data collection and then empowering AI to search […] Read more
US Nanotech Developer UbiQD Awarded SBIR Contracts By US Air Force Updated On Thu, Aug 18th, 2022 by Saurenergy UbiQD, a US-based nanotechnology development firm, has said that the US Air Force (AFWERX Program) had alloted it Small Business Innovation Research (SBIR) contracts. The current phase II contract funds two installations totaling more than 20 windows in addition to continuing to scale up and develop WENDOWTM, a quantum dot-tinted photovoltaic window technology from UbiQD. […] Read more
Solution Manager Teamcenter Updated On Thu, Aug 18th, 2022 by Saurenergy We are looking for Solution Manager, Technical Support & Problem management for our PDM/PLM system (Teamcenter), who is responsible for Level 3 support, Problem Management, Continuous service improvement, Business interaction, operational dashboards , Technical Architecture & improving performance for our Teamcenter PLM platform operations & maintenance. What will you be doing:- Problem Management and Level […] Read more
Solution Manager Teamcenter Manufacturing Updated On Thu, Aug 18th, 2022 by Saurenergy We are looking for Solution Manager, Technical support Manufacturing who is responsible for development, Level 3 support, Problem Management, Continuous service improvement for Teamcenter Manufacturing process planner, EBOM, PBOM and Business interaction in own responsibility area What will you be doing:- Perform development for new enhancements (CIP), bugs fixing, or projects of Wärtsilä PDM/PLM system […] Read more
Charging Infrastructure: The Backbone That is Driving a Transformation Updated On Thu, Aug 18th, 2022 by Saurenergy By Varun Goenka With global oil prices skyrocketing and petrol and diesel costs going up almost on a daily basis, there is an urgent need to switch over to a more sustainable energy option. Recognizing this, the Indian government has been actively trying to promote the use of electric vehicles (EVs). The Centre and several […] Read more
KREDA Issues Tender for Solar Battery Banks in Ladakh Updated On Thu, Aug 18th, 2022 by Saurenergy Kargil Renewable Energy Development Agency (KREDA) has floated a tender for supply, Installation and commissioning of solar tubular gel battery banks of various capacities at various locations across the Kargil District in the union territory of Ladakh. A high-performance tubular gel battery with a polypropylene copolymer container should be used. A pressure regulation valve should […] Read more
Explained: Bifacial Solar Panels Updated On Thu, Aug 18th, 2022 by Saurenergy While talking about solar panel installation, it is prudent to design your system to generate as much solar energy as possible. In recent times, Bifacial solar panels have been gaining prominence, thanks to more competitive prices and efficiency. A bifacial solar panel is a solar panel that can collect energy from the front side and […] Read more
Saudi Arabia’s ACWA Power to Sign $2.4 Billion Wind Project Deal in Uzbekistan Updated On Thu, Aug 18th, 2022 by Saurenergy Saudi Arabia based utility developer ACWA Power has said in a disclosure on Tadawul bourse that the company has signed a Heads of Terms (HoT) Agreement with Uzbekistan for the development of a 1500 MW wind energy project. As per the disclosure, the deal will be signed with the Ministry for Energy and Ministry of […] Read more