How Do Inverters Adapt To High-Power PV Modules? Updated On Tue, Dec 27th, 2022 by Saurenergy Background With the rapid development of solar cell and photovoltaic module technology, the nominal power of PV modules now regularly breaks through from 400W+ to 500W+ and even to 600W+. The rapid development and increase in power of modules has put forward new requirements for inverter adaptation. So how do you choose the appropriate inverter […] Read more
India’s EV Charging Roll Out, ‘Patla Pin’ Magic, And More Challenges Updated On Tue, Dec 27th, 2022 by Saurenergy For a nation that embraced the mobile phone with breakneck speed, pricey prices notwithstanding, the heyday of Nokia phones in the late 90s and through early 2000s became synonymous with the thin-pin charger, which was very popular and ubiquitous at the time. Such was its ubiquity that it was assumed that everyone or every home […] Read more
Daman District Invites Bids for Enhancement of 7.47 MW Diu Solar Plant Updated On Tue, Dec 27th, 2022 by Saurenergy UT Administration of Dadra & Nagar Haveli and Daman & Diu has solicited bids for the expansion of 2.56 MWp capacity at the 6 MW Solar PV Plant in Diu and 4.91 MW capacity at the 3 MWp Solar PV Plant in Diu. The last date for submitting the online bid is January 17, 2023, […] Read more
REIL Floats Tender for 15K MONO PERC & Multi-Crystalline Solar Cells Updated On Tue, Dec 27th, 2022 by Saurenergy The Rajasthan Electronics and Instruments Limited (REIL) has released a tender, inviting bids to procure 15,000 solar cells including 5.64 Wp for MONO PERC (7500 solar cells) & 4.81 Wp for Multi-crystalline silicon solar cells (7500 solar cells). The solar cell should be five busbars in length and 158.75 ± 0.5 x 158.75 ± 0.5 […] Read more
BHEL Invites Bids for O&M Services for 5 MW Solar Plant, Haridwar Updated On Tue, Dec 27th, 2022 by Saurenergy Bharat Heavy Electricals Limited (BHEL) has invited bids for Operations and Maintenance (O&M services) work of the 05 MW solar power plant at its heavy electrical equipment plant (HEEP) in Haridwar, Uttarakhand. The last date for submitting the bid of this 05 MW of Bharat Heavy Electricals Limited (BHEL) O&M tender is January 06, 2023, […] Read more
Copenhagen Infrastructure Partners Acquires 1400 MW Queensland RE Hub Updated On Tue, Dec 27th, 2022 by Saurenergy Copenhagen Infrastructure Partners (CIP), an investment firm that specialises in infrastructure investments, has confirmed that it has acquired the large-scale renewable energy hub called ‘Bowen Renewable Energy Hub’ in Australia’s Queensland. According to the company, the RE hub will also host a pumped hydro plant having a duration of 16-hours. CIP has contracted with Australian […] Read more
Project /Site Engineer – Solar Rooftop Updated On Tue, Dec 27th, 2022 by Saurenergy The role holder will be responsible for project execution of Rooftop/ Ground-mounted Solar Projects in the KW to MW scale. Responsible for project management and monitoring of site construction activities as per project execution plan. Pre Construction:- Inception and Survey of plant Verification of Roof build Verification of plant Layout Verification of material Checklist During […] Read more
Director/Sr. Manager/Manager- Business Consulting PI – AMI Updated On Tue, Dec 27th, 2022 by Saurenergy Energy Transition and Decarbonization (ET&D) are the key focus area of today’s changing energy landscape. Countries and corporations have pledged to significantly reduce GHG emissions in order to become climate neutral. In addition, decarbonization means creating long-term value for stakeholders which will ultimately not only pay off but also open up completely new business opportunities. […] Read more
RVUNL Invites Bids for 810 MW STU Connected Solar Tender for RVUN Park, Bikaner Updated On Tue, Dec 27th, 2022 by Saurenergy To establish 810 MW of state transmission utility-connected solar power projects in RVUNL’s Ultra Mega Solar Park in Bikaner, Rajasthan Rajya Vidyut Utpadan Nigam (RVUNL) has requested bids from solar project developers. These projects will be built-own-operate projects. November saw the release of the tender, however, it was quickly withdrawn. The bids must be submitted […] Read more