SUBSCRIBE NEWS LETTER

ET Energy

For Solar Cell Makers, TOPCon Is More Viable Than HJT: Bharat Bhut, Goldi Solar

With the advent of new and advanced solar cell technologies globally, different solar module and solar cell manufacturers have jumped onto the bandwagon to introduce more efficient technologies. With TOPCon and Heterojunction Technology (HJT) competing over their average effectiveness, Indian solar cell manufacturers find TOPCon more commercially viable for solar cell manufacturers compared to HJT […]

Read more

35 PV+Battery Hybrid Plants Achieved Commercial Operations in US in 2022: Berkeley Lab

Berkeley Lab has released a report on “Utility-Scale Solar, 2023′ presenting an analysis of empirical plant-level data from the U.S. fleet of ground-mounted photovoltaic (PV), PV+battery, and concentrating solar-thermal power (CSP) plants. The report shares details on the capacities exceeding 5 MWAC or of 5 MWAC or less, which also includes residential rooftop systems. Trends […]

Read more

India Had No Offshore Wind Capacity Installation As Of May 2023: GWEC

The ‘GWEC Global Offshore Wind 2023’ report cites that for fulfilling demand for large offshore wind, and turbine installation of vessels requires trained workforce with adequate operational knowhow for regional cooperation in the APAC Asia–Pacific region. The study finds that its timely deployment will foster cooperation especially in new markets such as India, the Philippines, […]

Read more

MERC Allows Tata Power Extension On SCOD For Its Hybrid Plants

The Maharashtra Electricity Regulatory Commission (MERC), in its latest judgment, allowed the Tata Power Green Energy (TPGEL) extension on its Scheduled Commercial Operation Date (SCOD) for two solar-wind hybrid projects. It included the 225 Megawatt (MW) hybrid project at Bikaner district in Rajasthan and a 98.05 MW hybrid plant in Maharashtra.  The hybrid renewable energy generator […]

Read more

Confirmware’s Automatic String Repair Machine Reduces Cell Breakages By 0.5%

In the fast-paced world of solar module manufacturing, the efficiency and reliability of the production process plays a vital role in delivering high-quality solar modules. One of the critical challenges faced by manufacturers is the breakage of cells in lines, which can significantly impact the yield and overall performance of the solar modules. Eliminating challenges […]

Read more

JSW Forges Partnership with Confirmware for 1.3 GW Turnkey PV Module Line

Confirmware, a solar module manufacturing equipment provider, has recently signed a contract with JSW, one of India’s largest conglomerates. This collaboration involves the installation of a massive 1.3 GW turnkey module line. This state-of-the-art manufacturing line will equip JSW with the capacity to produce high-quality solar modules at an unprecedented scale complemented by Confirmware’s cutting-edge […]

Read more

Diploma Designer Trainee – Electrical (ENR)

Burns & McDonnell India (BMI) Energy Division is looking for a well-rounded and driven Diploma Designer Trainee (DDT)-Electrical in the Mumbai Office.The Energy Division focuses on power generating facilities which offer a wide range of design and project execution experiences. Designs include the electrical interconnect to the bulk power grid and all associated power generating […]

Read more

Department Manager – Project Management GFS

Burns & McDonnell India is looking for an experienced individual with background in project management who is interested in growing their careers in people management role in an organization listed as Great Places to work in India. The “Global Facilities” (GFS) business unit handles engineering of industrial and commercial facilities in the North America region […]

Read more

Govt Plans Imposing 10% RE Generation Obligation (RGO) For Coal Plants

The Ministry of Power has been mulling to impose up to 10 percent Renewable Generation Obligation (RGO) for the new and old coal-fired thermal power plants and lignite plants in the country. It has put forth a new draft notification proposing the plan. It has asked the stakeholders to submit their feedback within 15 days.  The new […]

Read more
      SUBSCRIBE NEWS LETTER
Scroll