India To Generate 600 kT Solar Waste From Installed, New Capacity By 2030, Finds Study Updated On Thu, Mar 21st, 2024 by Saurenergy India’s installed 66.7 GW solar capacity, as of FY23, has generated about 100 kilotonnes (kt) of waste, which will increase to 340 kt by 2030, according to a study conducted by the Ministry of New and Renewable Energy and Council on Energy, Environment and Water (CEEW) ‘Enabling a Circular Economy in India’s Solar Industry: Assessing […] Read more
EKI Power Trading Appoints Rajiv Goyal As Its CEO, Whole-Time Director Updated On Thu, Mar 21st, 2024 by Saurenergy EKI Power Trading Pvt. Ltd. recently announced the appointment of Rajiv Goyal as its Chief Executive Officer (CEO) and Whole-Time Director. With a career spanning over 28 years, Goyal brings experience and expertise in the energy sector to his new role. A graduate of REC Calicut Kerala in Electrical and Electronics Engineering, Goyal furthered his […] Read more
Hitachi, Penske Launch Large-Scale Electric Truck Charging Pilot Updated On Wed, Mar 20th, 2024 by Saurenergy US-based Hitachi Energy and Penske Truck Leasing have announced the launch of their large-scale, centralised electric truck charging solution. This project supports Penske’s electric truck deployments for its customers in the Stockton, California area. Hitachi Energy an energy technology provider and transportation solutions company Penske Truck Leasing announced their joint initiative to set up a […] Read more
Turkey Moves To Regulate Solar Imports From Non-China Countries Updated On Wed, Mar 20th, 2024 by Saurenergy In an interesting move, Turkey has moved to create a level playing field for all countries exporting solar equipment to the country. The Ministry of Trade has announced a new measure that seeks to regulate solar panel imports from Vietnam, Malaysia, Thailand, Croatia, and Jordan. Under the measure from March 26, importers will be required to […] Read more
Senior Wind Analyst Updated On Wed, Mar 20th, 2024 by Saurenergy Perform quality control of meteorological data such as met mast, LiDAR and SoDAR’s Design of optimal site-specific measurement campaigns for wind farm sites, including cost/benefit assessments of different technologies Follow the BPP process and carry out energy yield estimation and propose relevant optimization based on constraints Responsible and take ownership in specific development projects for […] Read more
Wind Specialist Updated On Wed, Mar 20th, 2024 by Saurenergy Oversee the collection and quality control of meteorological data to ensure maximum data coverage and minimum uncertainty Ensure meteorological station contractors comply with relevant safety and technical requirements Design of optimal site-specific measurement campaigns for wind farm sites, including cost/benefit assessments of different technologies Align with the BPP process and carry out energy yield estimation […] Read more
Barclays, Lightsource bp Sign $140 Million Deal For Louisiana Solar Project Updated On Wed, Mar 20th, 2024 by Saurenergy Barclays and Lightsource bp have announced that they have committed to a $140 million tax equity deal which will finance the construction of the Prairie Ronde 180MWdc solar project in St. Landry Parish, Louisiana. According to a media statement by Lightsource bp, the deal is one of the first to be led by Barclays’ new […] Read more
SECI Invites Bids For Empanelment Of Agencies Under DPR Category Updated On Wed, Mar 20th, 2024 by Saurenergy SECI has released a tender for empanelment (RfE) for performing site studies for the preparation of DPR (Category A, B, and C). SECI tender mentioned A, B, and C categories for performing site studies and for preparation of DPR. The tender mentioned the category is as follows, i) Category A: Topographic Survey with Geotechnical investigation […] Read more
German OEM Enercon Launches New 7 MW Wind Turbine Updated On Wed, Mar 20th, 2024 by Saurenergy Germany-based OEM Enercon has announced the launch of a new wind turbine with new features for the E-175 EP5. As of 2026, ENERCON’s top model will be available in a version with a new two-piece permanent magnet generator with a nominal power of 7.0 MW. Moreover, a tower with a hub height of 175 meters will be […] Read more