SUBSCRIBE NEWS LETTER

ESS project

Changes In BIPV Components Can Hike PV Efficiency By 4.5%: Study

A recent research report on Building-Integrated Photovoltaics (BIPV) and its impact in cooling roofs shed light on several interesting facts. The research was undertaken by the researchers from the University of South Wales (Australia) and Calcutta University. The study demonstrated the growing significance of rooftop-integrated photovoltaic systems (PVs) in the solar energy landscape. The study […]

Read more

CATL and Quinbrook In Agreement for 10 GWh Stationary Battery Energy Storage Systems

CATL and Quinbrook have announced the signing of a Global Framework Agreement in stationary storage with the aim to deploy 10GWh+ of CATL’s advanced storage solutions over the next five years,underlining their focus on using advanced storage solutions to meet energy transition goals. The long-term partnership includes the design, optimization, and supply of the most […]

Read more

PVEL Updates Extended Reliability Testing Program

PV Evolution Labs (PVEL), the leading independent test lab for the downstream solar industry and member of the Kiwa Group, has announced upgrades to the company’s suite of extended reliability and performance tests, the Product Qualification Program (PQP). PVEL established the PQP in 2012 to provide empirical data for PV module benchmarking and project-level energy […]

Read more

Manager – Supplier Quality

This position is part of the Supplier Quality & Development in Vestas APAC region, which coordinates SQ&D activities and ensures the highest focus on quality, safety, and environment when developing and implementing the different category strategies while not compromising on Vestas’s standards and processes. The key task is to deploy strategic and operational development of […]

Read more

Design Engineer – Control & Protection

This position is responsible for working independently on fast paced technically complex Metro Railway Electrification design projects.  C&P Engineers are responsible for supporting or leading substation engineering project teams, with the development of protective relay design including relay selection, relay one-line diagrams, transmission and distribution system modeling, and protective relay settings coordination, development and calculations. […]

Read more

Gas Turbine – Test Instrumentation Designer & Product Definer

The Test instrumentation designer is responsible to design and product definition of instrumentation parts like probes, supports and test rig components. Extracting dimensions for manufacturing from drawings and 3D models as well as documentation by using NX & Teamcenter.  The designer should be able to understand the functional, assembly and manufacturing requirements and come up with […]

Read more

Principle Technical Expert -Power Electronics

The Senior Principal Technical Expert masters a strategic technology domain (Power Conversion) actively develops and deploys related innovation and expertise to offers (research, platforming, standardization, trends, partnership, intellectual property, reference documents). Holds a deep knowledge of typical power conversion product development processes and to support actively technical interactions with end-customers and solving of offer issues. Act […]

Read more

Electromechanics/Electrotechnology Staff Senior Design Engineer

The primary responsibility of this role is to lead design engineering activities for product development and evolution of LV Equipment’sto meet customer specific technical, cost and market related technology requirement in accordance with IEC standards. The candidate will be involved in all phases of product development. ROLES AND RESPONSIBILITIES:- Develop designs to meet electrical distribution market needs defined […]

Read more

Haryana Releases Draft Solar Policy, Aims To Install 6GW RE Power

The Haryana New and Renewable Energy Department has published its latest draft Solar Policy 2023. It has asked the stakeholders concerned to submit their opinion on the same within the next one month. In the latest draft note, the state renewable department aimed to install a cumulative 6000 Megawatt (MW) by 2030 in Haryana.   The agency […]

Read more
      SUBSCRIBE NEWS LETTER
Scroll