MHI Invites Bids For 100 MW SJVN Solar Project Survey, Planning in Rajasthan Updated On Mon, Mar 10th, 2025 by Saurenergy The Ministry of Heavy Industries (MHI) has issued a tender to engage an agency to undertake a topographical survey, soil investigation, preparation and submission of detailed progress reports, and initial layout submissions for the EPC package. This tender invites to develop a 100 MW solar project at Nawa, Rajasthan, for SJVNL Green Energy Limited. It’s […] Read more
Assistant Manager- Module Process Updated On Fri, Mar 7th, 2025 by Saurenergy Responsibilities:- Responsible for improving lamination quality of the modules by meeting the lamination product /process CTQ’s. Stringer & laminator Recipe settings & troubleshooting. Documentation for new processes, WI, SOP, Process parameters Preparation of Pre lam EL data and rework monitoring and take corrective and preventative action for controlling Pre El rework. Coordinate with quality team […] Read more
PowerGrid Wins Bid For Andhra Pradesh Transmission Project Updated On Fri, Mar 7th, 2025 by Saurenergy Indian transmission company Power Grid Corporation of India Limited (POWERGRID) successfully bids for the Andhra Pradesh transmission project. This project is under Tariff Based Competitive Bidding to establish the Inter-State transmission system for the project namely “Transmission System Strengthening at Kurnool-III PS for Integration of Additional RE Generation Projects” on build, own, operate and transfer […] Read more
Adapture Secures $321Mn Debt Facility For 441 MW Solar Project In US Updated On Thu, Mar 6th, 2025 by Saurenergy Adapture Renewables, Inc., a utility-scale solar and energy storage project developer, owner, and operator, has secured $321 million in financing from Mistubishi UFJ Financial Group (MUFG). This financing would support the construction of its largest project. Adapture Renewables’ Titanium portfolio (Titanium), is a 441 MW solar project spanning three sites across Arkansas and Illinois. The […] Read more
SECI Issues 2.7 MW Floating Solar Tender With BESS In Lakshadweep Updated On Thu, Mar 6th, 2025 by Saurenergy Soon after announcing plans to develop grid-connected Floating Solar PV (FSPV) projects at the beginning of 2025, SECI has now released a tender to build such projects in Lakshadweep. These projects will be located in two locations within the union territory —Agatti and Kavaratti—and include an optional Battery Energy Storage System (BESS). SECI has set […] Read more
R&D Project Manager – Portfolio HVDC Systems – IDC Updated On Thu, Mar 6th, 2025 by Saurenergy Responsibilities:- Translate product roadmap and technical vision into a R&D portfolio Backlog in the HVDC system R&D area. Develop IP and Collaboration strategy. Prepare and lead regular system portfolio synchronization with stakeholders. Support project review in the system portfolio. Maintain close collaboration with Product Management regarding the direction and content, as well as with Engineering, […] Read more
Saurenergy Explains: AC Block vs DC Block – Battle of BESS Updated On Thu, Mar 6th, 2025 by Saurenergy Renewable energy sources struggled to become a reliable alternative to fossil-based power for long. The Utility-scale battery energy storage systems (BESS) emerged as a panacea to renewable woes, with new renewable projects now even accommodating BESS as a part of the project. The landscape of utility-scale BESS is also now witnessing a dynamic evolution, with […] Read more
India’s Surge In Tendered Capacity Of RE Projects faces Multiple Risks Updated On Thu, Mar 6th, 2025 by Saurenergy India’s two consecutive years of record renewable energy tendering capacity has placed the country on a record capacity addition trajectory. With tenders equaling 73 GW in 2024 versus 58 GW in 2023, the numbers have surpassed even the central government’s own targets of 50 GW per year. These are among some of the findings of […] Read more
Process Owner Product Engineering (Electrical) Updated On Wed, Mar 5th, 2025 by Saurenergy The Product Lifecycle Process teams holds several roles and responsibilities in global process development, PLM implementations and drives PLM system developments to serve our corporate way of working, in particular to define end-to-end processes from product engineering, product modeling, product configuration, production engineering and product lifecycle viewpoint considering consistent data flow, efficiency, quality and simplicity […] Read more