NHPC Planning Clean Energy Projects of 27 GW in 9 States, Nepal: CMD Updated On Mon, Dec 20th, 2021 by Saurenergy State-owned NHPC has plans to set up new hydro and solar projects of more than 27,000 MW capacity in nine states and neighbouring country Nepal, the company’s CMD Abhay Kumar Singh has said. The new capacities would come up in Uttar Pradesh, Bihar, Odisha, Rajasthan, Tamil Nadu, Kerala, Maharashtra, Andhra Pradesh and Odisha, Singh told […] Read more
WBPDCL Issues Tender For 8 MW Solar Projects in Durgapur Updated On Thu, Dec 16th, 2021 by Saurenergy The West Bengal Power Development Corporation Limited (WBPDCL) has issued an e-tender cum reverse auction for the development of 8 MW Phase-II grid-connected solar PV plants situated in Durgapur, West Bengal. The full scope of the project includes the design, engineering, manufacture/procurement, supply, erection, testing and commissioning of 8 MW Phase-II grid-connected ground-mounted solar photovoltaic […] Read more
NTPC Green Arm Seeks Consultants for 325 MW Solar Projects In MP Updated On Thu, Dec 16th, 2021 by Saurenergy NTPC Renewable Energy Ltd, a wholly owned subsidiary of NTPC Ltd, has invited online bids for conducting a geotechnical investigation for the company’s 105 MW and 220 MW solar PV projects situated in Shajapur district, Madhya Pradesh. The deadline for bid submission is December 24, 3:00 PM. The bids will open on the same day […] Read more
MPC Energy Solutions Joins Leclanché For Battery Project In Caribbean Updated On Wed, Dec 15th, 2021 by Saurenergy Netherlands based MPC Energy Solutions (MPCES) has partnered with Leclanché, the Swiss maker of energy storage solutions to build the previously announced 35.7 MWp solar photovoltaic (PV) and 18.2 MW battery energy storage system (BESS) project designed with Leclanché Energy Management Software (L-EMS) in St. Kitts’ Basseterre Valley, next to the capital city of Basseterre. The project requires about US$ […] Read more
AGEL Signs 4667 MW PPA, Manufacturing Linked Project Moves Into High Gear Updated On Tue, Dec 14th, 2021 by Saurenergy Adani Green Energy Ltd (AGEL), the renewable energy arm of the diversified Adani Group, has signed an agreement with the Solar Energy Corporation of India (SECI) to supply 4,667 MW of green power. The firm claims this is the world’s largest ever green power purchase agreement. It also marks decisive movement on the 8000 MW […] Read more
MERC approves MSEDCL To Procure At Rs 3.05 For 111 MW Solar projects under MSKVY Updated On Mon, Dec 13th, 2021 by Saurenergy In an order issued last week, the Maharashtra Electricity Regulatory Commission (MERC) gave its approval to Maharashtra State Electricity Distribution Company Limited for starting the procurement process of 111 MW of grid connected Solar power projects under the ‘Mukhyamantri Saur Krishi Vahini Yojana’ (MSKVY). The order covers a total of 33 respondent firms who had […] Read more
Recruitment of Trainee Engineers / Project Engineers Updated On Mon, Dec 13th, 2021 by Saurenergy Bharat Electronics Limited, a Navratna Company and India’s Premier Professional Electronics Company under Ministry of Defence, requires the following personnel on contract basis for its Hyderabad Unit. 1. REQUIREMENT OF ENGINEERS:- Sl. No. Post Post Code No. of Posts Upper age limit as on 31.12.2021 * […] Read more
Component Engineering Project Manager Updated On Fri, Dec 10th, 2021 by Saurenergy Drives and guides the creation of a functional architecture for a complete Component and of a technical realization concept over all its domain and technical aspects. Evaluates different concepts with respect to technological and commercial aspects. Specifies and integrates standard products and subcomponents according to the required functionality of the component and coordinates their interfaces […] Read more
Recruitment of Project Engineer-I -ES Division Updated On Fri, Dec 10th, 2021 by Saurenergy Engineering Services Division of Bharat Electronics Ltd., a Navaratna Company and India’s premier professional electronics company requires the following personnel f or a period of Two years (extendable for maximum of two more years based on project requirement & performance of the individual) for execution of various prestigious projects. Post Qualification […] Read more