Germany’s ib vogt Begins Construction on Spain Project, Signs PPA with Google Updated On Thu, Nov 24th, 2022 by Saurenergy German’s turnkey PV plants provider, ib vogt has started construction on the 149 MWp Garnacha solar power plant located in the province of Zamora in Spain. The project signed a power purchase agreement (PPA) with Google for a period of 12 years, signaling the first major collaboration between ib vogt and Google. With a €90m […] Read more
ANERT Invites Bids to Develop 15 MW of Rooftop Solar Projects in Thiruvananthapuram Updated On Thu, Nov 24th, 2022 by Saurenergy The Agency for New and Renewable Energy Research and Technology (ANERT) has invited bids for the development of 15 MW of rooftop solar installations in Thiruvananthapuram. The last date for submitting the bid for this Agency for New and Renewable Energy Research and Technology (ANERT) 15 MW tender is November 29, 2022, at 05:00 pm, […] Read more
Tesla Constructs Europe’s Biggest Battery Next to Dogger Bank Offshore Wind Project Updated On Thu, Nov 24th, 2022 by Saurenergy A Tesla battery developer has claimed to be the largest battery deployed in Europe so far by storage capacity. The battery has been turned on in northeast England, close to the grid connection point for the sizable Dogger Bank offshore wind farm- a joint venture between SSE Renewables, Equinor (40%) and Vårgrønn. The industry leader […] Read more
Trainee Engineer-I / Project Engineer-I Updated On Tue, Nov 22nd, 2022 by Saurenergy Bharat Electronics Limited, a Navratna Company and India’s premier professional Electronics Company under the Ministry of Defence, requires the following personnel on Contract basis for Kotdwara Unit for its various projects locations all over India POST DISCIPLINE WISE NO. OF POSTS UPPER AGE LIMIT AS ON 15.12.2022 CONSOLIDATED REMUNERATION PER MONTH […] Read more
Project Engineer-I and Trainee Engineer-I Updated On Tue, Nov 22nd, 2022 by Saurenergy Bharat Electronics Limited, a Navratna Company and India’s Premier Professional Electronics Company under Ministry of Defence, requires the following personnel on temporary basis for its Machilipatnam Unit: 1. REQUIREMENT OF PROJECT/ TRAINEE ENGINEERS:- Post code Name of the post No. of posts Upper age limit as on 01.10.2022* Minimum post qualification experience […] Read more
Principal Engineer – Process Updated On Tue, Nov 22nd, 2022 by Saurenergy Candidate should have knowledge of chemical engineering to develop the BEP (Basic Engineering package) for chemical plants. He / She should manage the team of 10 to 15 staff to carried out the work on multiple projects. Have knowledge on multi discipline engineering Review and prepare the simulation of different chemical reactions with using Aspen […] Read more
Lead / Design Engineer Process Updated On Tue, Nov 22nd, 2022 by Saurenergy Provide technical guidance to the Process team in preparation/review of PFD, P & ID, HFD & Piping Material Specification, Sizing of Equipment, Utility Sizing, Heat Balance, Mass Balance, Hydraulic Calculation, Pump Selection, Process Instrumentation Datasheet, etc. Provide technical guidance in design/review using simulation soft wares namely, Bentley SisHyd, CHEMCAD & ASPEN, HTRI, CCTherm, B-JAC (HTFS), […] Read more
300 MW Solar Power Projects Planned By Punjab Govt Updated On Tue, Nov 22nd, 2022 by Saurenergy The state of Punjab’s administration has decided to put in place 300 MW worth of photovoltaic (PV) solar power installations. According to an official statement outlining the decision made at a high-level conference held recently, these projects comprise 100 MW floating solar PV power projects on reservoirs and lakes and 200 MW canal-top solar PV […] Read more
Project Development – Solar Projects Updated On Mon, Nov 21st, 2022 by Saurenergy Candidate shall be responsible for Solar Project Development, which shall include day-to-day liaison with various Government Authorities for project related approvals (concept to commissioning and post commissioning) in the State Karnataka and other southern States of India. Candidate shall also be responsible for coordinating land acquisition related activities for these Projects. Key Job activities:- The […] Read more