Waste Water Network Modeller Updated On Thu, May 20th, 2021 by Saurenergy Working closely with the engineering teams on wastewater and drainage studies, from feasibility through to detailed design stages. Supervise Graduate Engineers on various wastewater network modelling projects in line with client requirement and reviewing/checking of their work. Setting the technical direction for modelling studies while liaising with lead business. Resolving technical modelling issues on projects. […] Read more
Is The SB Energy Exit A Worrying Sign For India? Updated On Thu, May 20th, 2021 by Saurenergy By Now, the news of SB Energy’s portfolio buyout by Adani Green Energy (AGEL) has been well reported. The 100% buyout of SB Energy India assets by AGEL for $3.5 billion, for a fresh 4954 MW of additions to AGEL’s total assets including project pipeline, has been cited as a possible warning sign for India’s […] Read more
Principal Engineer – Mechanical (HVAC) Updated On Thu, May 20th, 2021 by Saurenergy Be responsible for planning and design of all building services elements of the particular discipline. Be responsible for concept design based on evaluation of various options in coordination with architectural, structural input and in accordance with initial load estimates. Do design calculations and quantity estimation. Ensure all design work is carried out in accordance with […] Read more
Energy Transition May Cost Upstream Oil & Gas Sector $14 T: WoodMac Updated On Thu, May 20th, 2021 by Saurenergy Even a rapidly transitioning world needs oil and gas supply for decades to come The energy transition represents US$14 trillion worth of uncertainty for upstream oil and gas, according to a new report by Wood Mackenzie. Oil and gas is a risky business. Over the years, those risks have been tempered by a single tenet […] Read more
Asst. Manager / Deputy Manager Updated On Thu, May 20th, 2021 by Saurenergy Sales of Mitsubishi Factory Automation Products – VFD, Servo, PLC, HMI, Robot, Scada and Motion, LVS products. Strong Knowledge of all FAID Products – Drive, VFD, Servo, PLC, HMI, Robot, Scada and Motion, LVS products. Candidate should have good exposure of front-end sales of VFD, HMI, PLC, Motion, LVS automation products and its various solutions. […] Read more
Green Hydrogen Not a Blanket Alternative to Fossil Fuels? Updated On Thu, May 20th, 2021 by Saurenergy Green hydrogen is increasingly being built up as the ideal clean fuel for a carbon-neutral tomorrow, but is it a viable replacement for the use of fossil fuels in cars or domestic heating systems? In a recently published study conducted by Germany’s Potsdam Institute for Climate Impact Research (PIK), scientists have found that even though […] Read more
Web Developer (Analyst/Senior Analyst) Updated On Thu, May 20th, 2021 by Saurenergy Creating web page display and writing codes by using standard HTML/CSS practices Derive data from various databases and integrate it to a web page Understanding the specifications and requirements based on technical needs Working with different content management systems Communicating design ideas using user flows, process flows, site maps, and wireframes Incorporating functionalities and features […] Read more
In a Tumultuous Year, Utility-Scale Solar Installations Decline 39% in FY21 Updated On Thu, May 20th, 2021 by Saurenergy According to a new report by JMK Research, about 3.5 GW of new utility-scale solar capacity was added in India in the fiscal year 2021 (April 2020-March 2021). Compared to the previous year (FY20), installations were about 39% lesser. While the wind capacity of the country increased by 1.5 GW in FY2021, it was found […] Read more
SECI Extends Bid Deadline for 50 MW Solar Tender in Tamil Nadu, Again Updated On Thu, May 20th, 2021 by Saurenergy SECI has extended the bid submission deadline for its tender for 50 MW solar PV projects with land having 10 years plant O&M at Tamil Nadu. The Solar Energy Corporation of India (SECI) has extended the bid submission deadline for its tender for the design, engineering, supply, construction, erection, testing and commissioning of 50 MW […] Read more