NHPC 1.2 GW Solar Bid Garners A Tariff Of Rs 2.56/unit Updated On Tue, Sep 10th, 2024 by Saurenergy NHPC Limited recently concluded the auctions for its 1.2 GW solar tender, announcing six winners for the project. These winners are Onward Solar, Rays Power Infra Limited, Essar Renewables, Mahindra Susten, and Avaada Group. The allocated capacities are as follows: Onward Solar was allocated 50 MW at Rs. 2.56 per unit, while Jevargi Solar (Rays […] Read more
NVVN Seeks Bids to Set Up 250 MW/500 MWh Standalone BESS Updated On Tue, Sep 10th, 2024 by Saurenergy NTPC subsidiary, Vidyut Vyapar Nigam Limited (NVVN), recently released a tender for setting up 250 MW/500 MWh standalone battery energy storage systems with viability gap funding support. NTPC released this tender under a tariff-based global competitive bidding request. The last date for bid submission is 17th September 2024. As per the NTPC Vidyut Vyapar Nigam […] Read more
GUVNL Issues Tender For 500 MW Solar Projects Updated On Thu, Aug 22nd, 2024 by Saurenergy GUVNL recently released a tender for the procurement of power through a competitive bidding process for a 500 MW Grid Connected Solar Photovoltaic Power Projects to be set up /under construction / already commissioned projects anywhere in India with Greenshoe option of additional capacity up to 500 MW without energy storage. The tender’s last date […] Read more
GUVNL Floats Tender For 500 MW Wind Project With GreenShoe Option Updated On Wed, Jul 17th, 2024 by Saurenergy The Gujarat Urja Vikas Nigam Ltd. (GUVNL) today issued a tender for a 500 MW wind power project, with an additional 500 MW green shoe option. The last date for the tender submission is August 14. The tender document said that the bidders can choose the locations anywhere in India. “The Projects shall be located […] Read more
SJVN Issues Tender For 1.2 GW Hybrid Projects Across India Updated On Mon, Jul 15th, 2024 by Saurenergy SJVN recently released a tender for the selection of hybrid power developers for setting up 1200 MW ISTS-connected wind-solar hybrid power projects in India. The tender mandates the hybrid power Developer (HPD) to set up a project that includes a transmission network up to the Interconnection/ Delivery Point. The project is undertaken to supply wind-solar […] Read more
NHPC Invites Bid for 1200 MW Wind Plant in Central, South India Updated On Thu, Feb 1st, 2024 by Saurenergy Indian public sector hydropower company NHPC has invited bids for wind power projects for a contracted capacity of 1200MW from Inter-State Transmission System (ISTS) connected Wind Power Projects under Tariff Based Competitive Bidding (TBCB) that will be conducted online. The last date for the submission of the bid is 28th February 2024 and the opening […] Read more
SECI Issues Tender For 1500 MW Of ISTS-Linked Solar Projects Updated On Tue, Jan 2nd, 2024 by Saurenergy The Solar Energy Corporation of India (SECI) has issued a tender seeking developers to establish solar-generating projects for the Inter-State Transmission System (ISTS). The central entity sought the tender under the tariff-based competitive bidding mode. As per SECI’s mandate, the developers would develop the projects under Build Own Operate (BOO) basis for an aggregate capacity […] Read more
ESMAP, World Bank Report Make Case For Energy-Plus Storage In India Updated On Fri, Dec 29th, 2023 by Saurenergy A recent report from the World Bank on energy storage program, introduced a framework for addressing intermittency challenges in solar and wind energy. The proposed solution involves integrating battery energy storage to manage variable energy output effectively. This report is by the Energy Management Assessment Program (EMAP) in collaboration with the World Bank (WB), the […] Read more
Bihar State Power Generation Company Ltd to Procure Power for 10 MW Floating PV Updated On Fri, Dec 1st, 2023 by Saurenergy Bihar State Power Generation Company Ltd (BSPGCL) has issued a tender for the procurement of power through tariff-based competitive bidding from grid-connected 10 MW (AC) floating solar PV power project to be set up under RESCO mode over the Reservoir of Phulwaria Dam at Rajauli, Nawada in the state of Bihar. The Earnest Money Deposit […] Read more