TMD – Mechanical Maintenance Updated On Thu, May 26th, 2022 by Saurenergy Increase the site operational effectiveness, improve on maintenance practices, mean time between failure and downtime reduction, and manage implement improvement plans, driving Key Performance Indicators (KPI’s) ensuring that Health, Safety and Environmental requirements are adhered to. Implement and manage continuous improvement by highlighting deficiencies and recommending changes in training, working practices and processes. Principle Accountabilities:- Reduce maintenance downtime by […] Read more
Engineer- Facilities III Updated On Tue, May 24th, 2022 by Saurenergy Works as part of a team to ensure all facilities & systems under ELEC Department responsibility are properly installed, tested and commissioned successfully to meet high quality of international technical standards such as: NETA (National Electrical Testing Association), NFPA 70B, NFPA 70E (National Fire Protection Association) and IEEE during the construction phase. The Facilities Engineer (Electrical Supervisor) daily […] Read more
CERC Allows Petition Of Karur Transmission Ltd Updated On Thu, May 19th, 2022 by Saurenergy The Central Electricity Regulatory Commission (CERC) allowed on May 17 the petition of Karur Transmission Ltd that the transmission charges for the project should be adopted because it was selected through a competitive bidding process. Karur Transmission Ltd had moved the CERC to examine whether the process as per provisions of the guidelines has been […] Read more
TATA Power Q4 Results Stay Strong, Eyes Faster Renewables Additions Updated On Sat, May 7th, 2022 by Saurenergy Tata Power Company reported a 31.4 percent year-on-year growth in consolidated profit at Rs 632 crore for the quarter ended March 2022. Revenue from operations grew 15.4 percent to Rs 11,960 crores during the quarter. The company has reported total income of Rs. 12219.36 crores during the period ended March 31, 2022 as compared to […] Read more
BSPGCL Invites Bids for Consultancy Services for Setting-up 200 – 250 MW Solar Power Plants Updated On Fri, May 6th, 2022 by Saurenergy Bihar State Power Holding Company Limited (BSPGCL) has issued tender for request for proposal for selection of agency for providing consultancy services for setting up 200 to 250 MW Solar Power Plants. The notification by BSPGCL says that as far as selection method is concerned, it would be combined quality cum cost based selection. The […] Read more
Engineer- Facilities III Updated On Mon, May 2nd, 2022 by Saurenergy Basic Job Functions:- Work as part of a team to ensure all facilities & systems under MECH Department responsibility are installed, tested and commissioned within technical requirements. Facilities/ systems include operations, preventive and corrective maintenance of MECH and other related facilities/ systems. Oversee main contractor and OEM (Original Equipment Manufacturer) performances, to ensure the project deliverables are met the project timeline. Create […] Read more
Project Electrical Engineer Updated On Fri, Apr 29th, 2022 by Saurenergy The Project Engineer is the technical guarantor of the proper performance of design works conducted in his/her field of activity, in matter of committed design budget (man days), deadline and Quality, in line with Customer expectation, while promoting ease of installation, operation and maintenance of the system. He/she plans basic and detailed design activities, manages […] Read more
April power demand hits new peak at 5,769MW in Delhi Updated On Thu, Apr 28th, 2022 by Saurenergy Delhi’s peak power demand broke yet another record on Wednesday and clocked 5,769 megawatt (MW) at 3.30pm, which is the highest ever for the national capital in April. The peak power demand had clocked 5,681 MW in Delhi on Tuesday. Sources said the previous record was 5,761 MW, registered just a week before, on April […] Read more
IEEFA: Widespread adoption of carbon capture, utilization and storage technologies in South East Asia remains highly unlikely Updated On Thu, Apr 28th, 2022 by Saurenergy Carbon, capture, utilization and storage (CCUS) is increasingly attracting attention in South East Asia. However, in the absence of the right drivers, its prospect in the region remains questionable, according to IEEFA’s latest report on CCUS in South East Asia. “CCUS can be viable when placed under a certain operational context, such as a high […] Read more