SECI Schedules Pre-Bid Meeting for 50 MW Solar Tender in Tamil Nadu Updated On Wed, Jan 27th, 2021 by Saurenergy SECI will be conducting a pre-bid meeting for its tender for the commissioning of a combined 50 MW solar PV project with land in Tamil Nadu. The Solar Energy Corporation of India (SECI) has notified that it will be conducting a pre-bid meeting for its upcoming project for the design, engineering, supply, construction, erection, testing […] Read more
SJVN Prepares for Possible 250 MW solar Project in Bihar With Tender for Land Updated On Mon, Jan 25th, 2021 by Saurenergy SJVN Limited, the public listed mini-ratna jointly owned by the Government of India and Himachal Pradesh state, has taken out a tender for leasing contiguous land holdings of 1250 acres to be considered for a solar power project. Typically, a land holding of that size will house close to 250 MW of solar projects. The […] Read more
GUVNL RFS For 500 MW Solar Projects Under Phase XII Out Updated On Mon, Jan 25th, 2021 by Saurenergy The Gujarat Urja Vikas Nigam Limited (GUVNL) has floated a request for selection (RfS) for 500 MW of grid-connected solar photovoltaic (PV) projects to be set up in the state in Phase XII. With this, the state has consolidated its lead as one of the most active state level undertakings to issue solar tenders successfully, […] Read more
NTPC 320 MW Project Awarded To Tata Power Solar Updated On Mon, Jan 25th, 2021 by Saurenergy Tata Power Solar on Saturday (January 23) announced that it has bagged an order worth ₹1,200 crore from national generator NTPC for setting up of a 320 MW ground-mounted solar project. For Tata Power Solar, India’s largest integrated solar company and a wholly-owned subsidiary of Tata Power, the win is a boost to its project pipeline, now […] Read more
Waaree Targets 5 GW Capacity by 2021 With 3 GW Module Line From Jinchen Updated On Mon, Jan 25th, 2021 by Saurenergy Chinese module manufacturer Yingkou Jinchen Machinery Co., Ltd. (Jinchen), has announced the signing of a deal with Mumbai based manufacturer Waaree Energies for a 3 GW high efficiency photovoltaic modules automatic production line. This is the largest stand alone project for any Chinese equipment manufacturer and any firm overseas. Waaree, led by Chairman and MD […] Read more
Budget 2021. Familiar Tussle Between Developers And Manufacturers Updated On Mon, Jan 25th, 2021 by Saurenergy As the 2021 budget comes around on February 1, it is widely considered to be one of the most critical of the century, coming as it does after the Covid-19 pandemic, which is still to end. While the start of vaccination has brought in a semblance of control back to the government on its future, […] Read more
Vietnam’s Record 9.5 GW of Rooftop Solar Addition Is A 2020 Success Story Updated On Mon, Jan 25th, 2021 by Saurenergy Back in 2019, when predictions for 2020 were still being made, not a single analyst could have predicted the convulsions that Covid-19 would cause across industry, including the solar sector. With 2020 behind us finally, it is instructive to look at Vietnam, a market where Covid seems to have had zero impact, with the country […] Read more
L&T Pockets 410 MW EPC Wins in Gujarat Updated On Sat, Jan 23rd, 2021 by Saurenergy The Renewable Business Unit of Larsen & Toubro (L&T), the construction and engineering giant, has clinched some key contracts in Gujarat in the past week. These contracts were won through GSECL (Gujarat State Electricity Corporation Limited) and NTPC Limited. The GSECL contract for 210 MW capacity solar project as won through an e-reverse auction on […] Read more
Exploring the Reasons behind Solis’ Rapid Growth Updated On Sat, Jan 23rd, 2021 by Saurenergy Zhejiang, China, 21 January 2021- 2020 is deemed to be a year that is hard to forget. It witnessed COVID-19 sweeping the world, and the global economy faltered. However, in China, new solar PV installations were up to 48.2GW in 2020, a 55% year-on-year increase. Among leading global inverter manufactures, there is a one that […] Read more