2 Days After 12 GW Manufacturing ‘Stimulus’ Time For Reality Check Updated On Fri, Feb 8th, 2019 by Saurenergy On Feb 6, the government announced a move to push central public sector undertakings towards a 12 GW solar plan, powered completely by domestic manufacturing. Will this finally kick start domestic manufacturing? 2 days after the announcement, we spoke to industry insiders, as well as considered the factors that could make or break this latest […] Read more
TENDER FOR DESIGN, ENGINEERING, PROCUREMENT, SUPPLY, CONSTRUCTION, ERECTION, TESTING, COMMISSIONING AND O&M OF 50 MW (AC) SOLAR PHOTO VOLTAIC POWER PLANT AT KASARGOD SOLAR PARK, KERALA Updated On Fri, Feb 8th, 2019 by Saurenergy This has reference to the RfS No. SECI/C&P/NIT/2019/THDC50 dated 08/02/2019 regarding Design, Engineering, Procurement, Supply, Construction, Erection, Testing, commissioning and O&M of 50 MW (AC) Solar PV Power Plant at Kasargod Solar Park, Kerala The RfS document has been uploaded on www.tcil-india-electronictender.com (Only viewed on Microsoft Internet explorer 10.x or above browser) and https://eprocure.gov.in/cppp/. Prospective bidders are requested to refer to TCIL […] Read more
Haryana Issues Tender For 10 MW Floating Solar PV Plant Updated On Thu, Feb 7th, 2019 by Saurenergy The floating plant will be set up at a raw water reservoir at the Rajiv Gandhi Thermal Power Plant in Khedar, Hisar. The Haryana Power Generation Corporation Limited (HPGCL) has floated a tender for developing a 10 MW floating solar PV power plant in the state. The HPGCL will provide the site for free and […] Read more
Arunachal Pradesh Soon to Be Declared 100% Electrified Updated On Thu, Feb 7th, 2019 by Saurenergy The PM will lay the foundation stone of Sella Tunnel and its approach road in Tawang district besides the declaration of 100 percent household electrification in the state under the Saubhagya Scheme. Prime Minister Narendra Modi on his visit to Arunachal Pradesh on February 9, 2019, is set to declare the state 100 percent electrified. […] Read more
SECI Reschedules Pre-Bid Meeting for 3 GW Manufacturing Linked Solar Tender Updated On Thu, Feb 7th, 2019 by Saurenergy The pre-bid meeting scheduled for February 13, 2019, has been rescheduled for February 18, 2019. The Solar Energy Corporation of India (SECI) has rescheduled the pre-bid meeting for its RfS issued for selection of solar power developers for setting up of 3 GW ISTS connected solar PV power plant linked with setting up of 1.5 […] Read more
With 10 GW targets for 2019 in Wind and Solar, SECI has its task cut out Updated On Thu, Feb 7th, 2019 by Saurenergy The focus this year will be on storage, and possibly, hybrid ‘wind-solar’ projects. After a rather ‘disappointing’ 2018, when large cancellations made an appearance for the first time, besides the uncertainty around GST, duties, and even state level flip flops, 2019 promises to be a tough year for SECI. We look at what it might […] Read more
Budget 2019: Govt Hikes Allocation under FAME Scheme by 34.5% to Rs 195 Cr Updated On Wed, Feb 6th, 2019 by Saurenergy The government had allocated Rs 145 crore for the current financial year, as per the Union Budget revised data for the financial year 2018-19. With an aim to provide further boost for the adoption and manufacturing of electric vehicles in India, the Central Government has increased the sum allotted under its ambitious FAME India (Faster […] Read more
Abu Dhabi Commissions World’s Largest Storage Battery Updated On Wed, Feb 6th, 2019 by Saurenergy The battery could potentially power the city of Abu Dhabi for six hours in case of a failure in the main grid. Otherwise, it will serve a function as a load balancer for the network. Abu Dhabi has commissioned a grid-scale deployment of a sodium-sulphur storage battery with a capacity of 108 MW/646 MWH battery […] Read more
Work Begins on Solar Plant at Kozhikode Railway Station Updated On Wed, Feb 6th, 2019 by Saurenergy From the Southern Railways, REMCL aims to generate upwards of 4 MWp electricity from its rooftop structures. In line with the Indian Railways objective to become self-reliant for meeting its energy needs from clean energy sources, work on the 100 kW solar plant at the Kozhikode Railway station has commenced. The project is conceived by […] Read more