Uttar Pradesh Floats Tender for 75 MW of Grid-Connected Solar Projects Updated On Wed, Mar 24th, 2021 by Saurenergy Uttar Pradesh New and Renewable Energy Development Agency (UPNEDA) has floated an e-tender for setting up a 75 MW grid-connected solar PV power project in UP solar park, Uttar Pradesh. As part of the Government of India’s target to achieve a cumulative capacity of 100 GW Solar PV installations by the year 2022, UPNEDA wishes […] Read more
Solar Firms Almost Unanimous on 10 kW Rule for Net-Metering – It’s a Disaster Updated On Wed, Mar 24th, 2021 by Saurenergy While industry reaction to the new rules from the Ministry of Power that mandates net metering upto a limit of 10 kW only have been well reported, we decided to speak to installers across states to get a broader view. What we see is a very clear divide between a vast number of smaller installers, […] Read more
H24US Drives the Science of Hydrogen Separation Updated On Tue, Mar 23rd, 2021 by Saurenergy H24US has announced that its advanced polymer membrane technology has the best-known observed performance in selecting hydrogen (selectivity) from other gases with very high throughput (permeability) indicating that this technology is one of the current leaders in this field. This outstanding performance was contrasted to other membranes via direct comparison of published data in an […] Read more
SECI Reschedules Pre-bid Meeting for its 1785 MW Rajasthan Solar Tender Updated On Wed, Mar 17th, 2021 by Saurenergy SECI has notified that it has rescheduled the pre-bid meeting for its tender for setting up 1785 MW solar projects in Rajasthan (Tranche-IV). The Solar Energy Corporation of India (SECI) has notified that it has rescheduled the pre-bid meeting for its tender for the selection of Solar Power Developers (SPDs) for setting up 1785 MW […] Read more
40% on Modules & 25% on Cells, MNRE to Impose BCD From April 1, 2022 Updated On Thu, Mar 11th, 2021 by Saurenergy The Ministry of New and Renewable Energy (MNRE) has finally finalised the new Basic Customs Duty (BCD) on solar PV cells and modules. As per an office memorandum, the Ministry is going to impose a 25 percent BCD on solar PV cells and 40 percent duty on solar modules without grandfathering of bid-out projects. However, […] Read more
Credit Quality Of Large Indian Renewable Players Intact, Says Moody’s Updated On Wed, Mar 10th, 2021 by Saurenergy Moody’s Investor Service, the global credit ratings firm, has been reported to have declared that the credit quality of Indian renewable energy firms remains intact, post the end of the 2019 and 2019 financial years. Or till the period ending March 2020. The firm’s report has included 5 of the largest rated renewable firms in […] Read more
Longi Solar Top Module Supplier to India In 2020, Says Report Updated On Tue, Mar 9th, 2021 by Saurenergy China’s LONGi Solar, a global leader in high-efficiency mono-crystalline solar cells and modules, has been named India’s market leader based on module shipments in 2020, according to a recent study by Gurugram-based research firm JMK Research. For LONGi, the numbers will be gratifying, as it has taken the firm just over 2 years to make […] Read more
Japan’s ORIX Corporation Completes Acquisition of Shares in Greenko Updated On Mon, Mar 8th, 2021 by Saurenergy ORIX has completed the acquisition of shares in Greenko Energy taking 21.8% of the firms’ shares for a total value of approx USD 961 million. ORIX Corporation (ORIX) has announced that it has completed the acquisition of shares in Greenko Energy Holdings (Greenko) as reported by both firms on September 11, 2020. Simultaneous to acquiring […] Read more
As Solar Spreads, Shrinking Space for Wind Updated On Wed, Mar 3rd, 2021 by Saurenergy It was one of the lesser noticed misses caused by the 2020 pandemic. In fact, we had predicted it in our own January 2020 issue. When Solar capacity would overtake wind in India. But come 2021, and wind energy has finally been overtaken. The news, when it was finally confirmed, couldn’t have been announced with […] Read more