Assistant Manager – Operations & Maintenance Updated On Tue, Nov 30th, 2021 by Saurenergy Test or evaluate photovoltaic (PV) cells or modules. Review specifications and recommend engineering or manufacturing changes to achieve solar design objectives. Perform thermal, stress, or cost reduction analyses for solar systems. Develop standard operation procedures and quality or safety standards for solar park. Provide technical direction or support to installation teams during installation, start-up, testing, […] Read more
Assistant Manager Updated On Tue, Nov 30th, 2021 by Saurenergy Test or evaluate photovoltaic (PV) cells or modules. Review specifications and recommend engineering or manufacturing changes to achieve solar design objectives. Perform thermal, stress, or cost reduction analyses for solar systems. Develop standard operation procedures and quality or safety standards for solar park. Provide technical direction or support to installation teams during installation, start-up, testing, […] Read more
Azure Power Signs PPA’s For 600 MW With SECI For Its 4 GW Mfg. Linked Projects Updated On Thu, Nov 18th, 2021 by Saurenergy Azure Power today announced that it has signed Power Purchase Agreements (PPAs) for 600 MW ISTS connected solar power projects with Solar Energy Corporation of India (SECI), under its 4 GW manufacturing linked projects, which will supply power for 25 years at a fixed tariff of INR 2.54 (~US 3.4 cents) per kWh. The projects will be constructed in […] Read more
Decoding The Reliance Gambit In Renewable Energy Updated On Tue, Nov 9th, 2021 by Saurenergy It All Started in 2017 It was on the firm’s 40th anniversary celebrations in 2017 that Mukesh Ambani, Chairman, Reliance Industries first asked the rhetorical question, “Can Reliance become a clean energy company?”. “Why Not?”, he answered it himself at the time, without getting into any further details. Almost three years later, at the firm’s […] Read more
MNRE Releases Updated ALMM List With 8 New Additions Updated On Fri, Oct 1st, 2021 by Saurenergy The Ministry of New and Renewable Energy (MNRE) has issued an updated list of approved manufacturers in its ALMM (Approved list of module manufacturers) list. The List is effective September 29, 2021, with the certifications valid to September 28, 2023, or two years. Unlike the few number of additions in the last list — three […] Read more
Heard at REI 2021- 5 Takeaways From The Expo Updated On Mon, Sep 20th, 2021 by Saurenergy At the recently concluded REI 2021, it was an impressive show of strength for the sector, despite the usual hits and misses one would expect in a year like this. So while the Chinese presence was on the lower side, especially Chinese senior management from the top firms like Longi Solar, Jinko, Huawei etc, the […] Read more
REI Expo 2021 Is Back. Important Dates and Details Updated On Mon, Sep 6th, 2021 by Saurenergy The Renewable Energy India (REI) Expo, among Asia’s largest and most influential expo’s in the RE space by Informa Markets in India, is back this year in its 14th epic edition in a physical format. Scheduled for 15th – 17th September 2021 at the India Expo Mart, Greater Noida, REI is supported by Indian Biogas Association (IBA), […] Read more
Azure Power Hopeful of No Price Markdowns As PSA’s Finally Start on Its 4 GW Mfg Linked Win Updated On Thu, Sep 2nd, 2021 by Saurenergy At an analyst call post its Q1 results for 2022-23, Azure Power CEO Ranjit Gupta expressed the hope that there will be no price markdowns on the winning bid rates, for its 4 GW tender manufacturing linked tender wins. Azure had won a total project capacity of 4 GW, even as Adani Green Energy won […] Read more
SECI Gets Bids Over 10 GW for Rajasthan 1785 MW Tender Updated On Thu, Jul 22nd, 2021 by Saurenergy Continuing the strong trend observed across all significant tenders since the last quarter, a source at SECI confirms that they have seen a very strong response to the tender for 1785 MW solar projects in Rajasthan. Without confirming the final list, the source tells us that bids have been received for almost 10 GW, and […] Read more