TMD – Mechanical Maintenance Updated On Thu, May 26th, 2022 by Saurenergy Increase the site operational effectiveness, improve on maintenance practices, mean time between failure and downtime reduction, and manage implement improvement plans, driving Key Performance Indicators (KPI’s) ensuring that Health, Safety and Environmental requirements are adhered to. Implement and manage continuous improvement by highlighting deficiencies and recommending changes in training, working practices and processes. Principle Accountabilities:- Reduce maintenance downtime by […] Read more
Davos Casts A Spell, ReNew Power Signs Another MoU With Karnataka Updated On Wed, May 25th, 2022 by Saurenergy Davos seems to be working like a magnet to all stakeholders in renewable energy from across India. MoU after MoU have been signed here on the sidelines of World Economic Forum. Soon after signing an MoU with Maharashtra a couple of days ago, ReNew Power on May 25, signed another Memorandum of Understanding (MoU) with […] Read more
Maharashtra, ReNew Power Sign Rs 50,000 Crore RE MoU In Davos Updated On Wed, May 25th, 2022 by Saurenergy The Maharashtra energy department and ReNew power, one of India’s leading renewable energy companies, signed an MoU of Rs 50,000 crore in Davos on May 24 for investments in renewable energy in the state for the next six to seven years. Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) Managing Director Vijay Singhal signed the MoU […] Read more
PVEL Scorecard 2022 Confirms Improving Quality, Performance From Top Manufacturers Updated On Thu, May 19th, 2022 by Saurenergy PV Module Reliability Scorecard 2022 is out. 25 manufacturers have made it to the list. 3 India based manufacturers, Adani Solar, Vikram Solar and Waaree Solar make it to the list, although only Adani Solar seems to have performed creditably across all parameters. The Germany based PVEL’s scorecards summarise results from the independent testing and […] Read more
The Top 5: Key Cement Manufacturers & Their Net-zero Goals Updated On Thu, May 19th, 2022 by Saurenergy The 20th century onwards has belonged to concrete in many ways. Alongside its strength and resilience, concrete is crucial and ideal for the building, being relatively cheap and simple to make. Each year 30 billion tonnes of concrete is used globally. Although concrete structures are, in many ways, ideal for climate-resilient construction, it is also […] Read more
CERC Allows Petition Of Karur Transmission Ltd Updated On Thu, May 19th, 2022 by Saurenergy The Central Electricity Regulatory Commission (CERC) allowed on May 17 the petition of Karur Transmission Ltd that the transmission charges for the project should be adopted because it was selected through a competitive bidding process. Karur Transmission Ltd had moved the CERC to examine whether the process as per provisions of the guidelines has been […] Read more
UK Carbon Capture Firm Storegga Raises £51.3m Funding Updated On Wed, May 18th, 2022 by Saurenergy UK cleantech and renewable energy firms continue to get foreign capital every day. UK carbon capture firm Storegga has announced a £51.3m funding boost on May 17 from a host of international backers, a report mentioned adding further that UK firms enjoyed the confidence of international investors counting on it to drive the transition to […] Read more
Assistant Manager – Sustainability & Climate Change Updated On Mon, May 16th, 2022 by Saurenergy The Group has identified sustainability and broader elements of ESG as a priority in the next phase of its growth. The Group sustainability function will focus on group level policies, processes and guidelines, education, capacity building, quality and governance of ESG-related issues, identification of Group level ESG ambitions, its linkages to corporate brand and advising […] Read more
Assistant Manager- Electrical (ERC) Updated On Fri, May 6th, 2022 by Saurenergy Basic Engineering of Electrical work Review of detailed engineering for Electrical work Key Responsibilities:- Primary Area of Responsibility – 90%:- Selection of Electrical Equipment as per process requirement, P & I D and Tender Documents, and Scrutinized the scope of work for Electrical. Preparation of Electrical Documents i.e. Electrical Load List, MCC Sizing, SLD, Cable […] Read more