Senior Manager – Module Production Updated On Fri, Dec 17th, 2021 by Saurenergy Incumbent shall be responsible for production targets of Module plant & various developmental activities in module lines, in addition to shop floor control, to increase production throughput and Yield parameters. Role & Responsibilities:- Responsible for Proper Manpower handling for Production line. Handling of Entire Production Line of GW scale Ensuring day wise & shift wise […] Read more
AGEL Signs 4667 MW PPA, Manufacturing Linked Project Moves Into High Gear Updated On Tue, Dec 14th, 2021 by Saurenergy Adani Green Energy Ltd (AGEL), the renewable energy arm of the diversified Adani Group, has signed an agreement with the Solar Energy Corporation of India (SECI) to supply 4,667 MW of green power. The firm claims this is the world’s largest ever green power purchase agreement. It also marks decisive movement on the 8000 MW […] Read more
Assistant Manager – Operations & Maintenance Updated On Mon, Dec 13th, 2021 by Saurenergy Test or evaluate photovoltaic (PV) cells or modules. Review specifications and recommend engineering or manufacturing changes to achieve solar design objectives. Perform thermal, stress, or cost reduction analyses for solar systems. Develop standard operation procedures and quality or safety standards for solar park. Provide technical direction or support to installation teams during installation, start-up, testing, […] Read more
Senior Engineer Updated On Mon, Dec 6th, 2021 by Saurenergy Test or evaluate photovoltaic (PV) cells or modules. Review specifications and recommend engineering or manufacturing changes to achieve solar design objectives. Perform thermal, stress, or cost reduction analyses for solar systems. Develop standard operation procedures and quality or safety standards for solar park. Provide technical direction or support to installation teams during installation, start-up, testing, […] Read more
India’s Solar Path-The Firms, Individuals and Organisations That Will Matter Updated On Wed, Dec 1st, 2021 by Saurenergy 2021 has marked a return to bump up in capacity addition in solar, after the last peak in 2017-18 when the country added close to 9.5 GW taking solar to the top among all energy options for capacity added. With this year likely to see over 11 GW of fresh capacity addition, it says something […] Read more
Assistant Manager – Operations & Maintenance Updated On Tue, Nov 30th, 2021 by Saurenergy Test or evaluate photovoltaic (PV) cells or modules. Review specifications and recommend engineering or manufacturing changes to achieve solar design objectives. Perform thermal, stress, or cost reduction analyses for solar systems. Develop standard operation procedures and quality or safety standards for solar park. Provide technical direction or support to installation teams during installation, start-up, testing, […] Read more
Assistant Manager Updated On Tue, Nov 30th, 2021 by Saurenergy Test or evaluate photovoltaic (PV) cells or modules. Review specifications and recommend engineering or manufacturing changes to achieve solar design objectives. Perform thermal, stress, or cost reduction analyses for solar systems. Develop standard operation procedures and quality or safety standards for solar park. Provide technical direction or support to installation teams during installation, start-up, testing, […] Read more
Coal India Subsidiary to Set Up 50MW Solar Plant in Odisha at ₹302 Cr Updated On Mon, Nov 29th, 2021 by Saurenergy Mahanadi Coalfields Limited (MCL), a subsidiary of Coal India will set up a 50 megawatt (MW) solar power plant in Odisha’s Sambalpur at a total cost of Rs 301.92 crore, moving steadily towards its goal to achieve carbon neutrality by 2024. MCL has placed a turnkey order to set-up a 50 MW solar power plant […] Read more
Azure Power Signs PPA’s For 600 MW With SECI For Its 4 GW Mfg. Linked Projects Updated On Thu, Nov 18th, 2021 by Saurenergy Azure Power today announced that it has signed Power Purchase Agreements (PPAs) for 600 MW ISTS connected solar power projects with Solar Energy Corporation of India (SECI), under its 4 GW manufacturing linked projects, which will supply power for 25 years at a fixed tariff of INR 2.54 (~US 3.4 cents) per kWh. The projects will be constructed in […] Read more