Orb Energy Launches 35 MW Solar Park In Karnataka Updated On Wed, May 22nd, 2024 by Saurenergy Orb Energy has launched a 35 MW (DC) ground-mounted solar park in Arsikere in the Hassan district, a significant player in the Indian solar power business, the firm announced on Tuesday. This 110-acre solar park, which produces 5.24 crore units of green power annually and offsets 45,000 tons of carbon dioxide, was built especially to […] Read more
NHPC Opens Bids For 200 MW Solar Project In Khavda, Gujarat Updated On Mon, May 20th, 2024 by Saurenergy National Hydroelectric Power Corporation (NHPC) has invited bids for the commissioning of a 200 MW grid-connected solar PV power project in Gujarat State Electricity Corporation Limited (GSECL) renewable energy (RE) solar parks at Khavda, Gujarat (Stage-3) with operation and maintenance for 5 yrs. The NHPC tender was released on 17 May 2024 at 06:30 PM […] Read more
Module Supply: ReNew, Emmvee, Vikram Solar Win NTPC’s Khavda Tender Updated On Sat, May 18th, 2024 by Saurenergy NTPC REL (Renewable Energy Limited) has awarded the contracts of supply of solar modules for its 1,255 MW solar project to three solar module manufacturers. Three companies-Emmvee, ReNew and Vikram Solar emerged as the winners of the NTPC REL’s tender. The tender was floated in September 2023. The solar project is scheduled to come up […] Read more
Chitradurga, Bellary Emerge As New RE Hotspots In Karnataka Updated On Thu, May 16th, 2024 by Saurenergy Karnataka is among the leading renewable-rich states in India. It is also touted as one of the earliest adopters of green energy. As per the latest data from the Ministry of New and Renewable Energy (MNRE), Karnataka ranks third in India when it comes to total solar capacities. Till April 2024, the southern Indian state […] Read more
MNRE Issues Order To Simplify Solar Park Documentation Updated On Wed, May 15th, 2024 by Saurenergy The Ministry of New and Renewable Energy (MNRE) in its latest order exempted the vetting of Detailed Project Reports (DPRs) and solar parks infrastructure development charges and O&M charges of solar parks by the State Government Committee. This was done by demands were made by the developers to ease out the process. The new notification […] Read more
Dutch Offshore Wind Plant To Have Floating Radars To Protect Birds Updated On Fri, May 10th, 2024 by Saurenergy The Hague-based Robin Radars will be deploying radars at offshore wind farms to protect birds and bats from related accidents. Robin will set up four flagship MAX bird detection radars to support Ecowende in its ecological wind farm off the Dutch coast. Ecowende is pressing for a sustainable future for offshore wind; one that positively […] Read more
Senior Engineer – Lighting Updated On Thu, May 9th, 2024 by Saurenergy Responsibilities This role is for a Senior Lighting Design Engineer, to contribute to Lighting design for: Highways including motorways, transport, infrastructure, city beautification and residential areas Industrial facilities, Decorative lighting projects, Sports facilities, Car parks, Amenity areas Site surveys/desktop study including: To determine the existing infrastructure pre-design Lighting assessments for environmental impact and obtrusive lighting […] Read more
EU Rooftop Solar Standard Can Provide Power To 56 Mn Homes Updated On Thu, May 9th, 2024 by Saurenergy The European Energy Performance of Buildings Directive recently entered into force with the publication of the rule in the official journal of the European Union (EU). Its implementation could provide solar power equivalent of 56 million European homes. A preliminary analysis conducted by SolarPower Europe suggests that the EPBD could drive the installation of 150 […] Read more
The Renewable Energy Developers Whose Plans Will Shape India’s Solar Targets Updated On Thu, May 9th, 2024 by Saurenergy India reached a notable milestone in renewable energy by adding a record-breaking 18.48 GW in 2023-24, a 21 per cent increase from the previous year. As of March 31, 2024, India’s installed renewable energy capacity stood at 143.64 GW, excluding large hydropower projects. The country needs an annual addition of at least 50 GW for […] Read more