Vistra 1200 MWh Storage

Vistra Brings Online its 1200 MWh Battery Storage System in California

Vistra has announced its 1200 MWh Moss Landing Energy Storage Facility was successfully connected to the power grid and has begun operation. Vistra has announced that its Moss Landing Energy Storage Facility was successfully connected to the power grid and began operating on December 11, 2020. At 300 MW/ 1200 MWh, the lithium-ion battery storage system, located […]

Read more
      SUBSCRIBE NEWS LETTER
Scroll