Vestas Secures 153 MW Wind Energy Order In US Updated On Tue, Feb 27th, 2024 by Saurenergy Renewable energy company Vestas received a 153 MW order to power an undisclosed wind project in the USA. The order consists of 34 V150-4.5 MW wind turbines. The orders include supply, delivery, and commissioning of the turbines, as well as a multi-year Active Output Management 5000 (AOM 5000) service agreement, designed to ensure optimized performance […] Read more
Assistant Lead Engineer – Panel Design Updated On Mon, Feb 19th, 2024 by Saurenergy Responsibilities:- You will be delivering technical solutions to the product and deeply involved in project execution You will be creating/updating the technical specifications, design verification plans, preparing procedures, and reports related to LV Panels and Cables, and mainly Electrical documentation like panel layouts, general arrangements, electrical schematics, and Operation and Maintenance manuals You will have a […] Read more
Commissioning Supervisor – Wind Turbine Authorized Technician Updated On Mon, Feb 19th, 2024 by Saurenergy Responsibilities:- Reviews contractual documentation Reviews engineering documents to ensure that the commissioning & startup requirements are accounted for in the design Prepares and keeps up to date the pre-commissioning and commissioning execution plans (including the schedule and the mobilization of personnel and equipment) Electrical, mechanical, and hydraulic work on WTG’s On-site supervision of new and […] Read more
TagEnergy, Vestas Join Forces To Develop 220-MW Spanish Wind Portfolio Updated On Wed, Jan 31st, 2024 by Saurenergy Global clean energy enterprise TagEnergy and wind energy major Vestas have come together to develop 220-MW wind portfolio in Spain. The joint venture will see Vestas acting as lead developer and TagEnergy will draw on its experience developing wind farms to determine and shape the most cost-efficient model. The new wind energy project will come […] Read more
Senior Engineer / Assistant Lead – Condition Monitoring Updated On Tue, Jan 23rd, 2024 by Saurenergy Responsibilities:- Primary duties will be monitoring and diagnosing the health condition of wind turbine gearboxes, main bearings and generators to highlight potential failures and/or damages before they happen Technical reporting of potential reliability conditions Constant interaction with service operations performing a follow up on the alerts detected by the system and the technical actions applied […] Read more
Lead Engineer – Mould / Composites Updated On Tue, Jan 23rd, 2024 by Saurenergy Responsibilities:- Accountable for providing the most robust, reliable, efficient design solution with highest performance and lowest cost Accountable for understanding, clarifying and reviewing tooling design specification, design verification & validation, design risk associated in manufacturing value chain Responsible to drive projects with complete ownership, perform technical & embrace challenges Drive process improvements with innovative solutions […] Read more
Validation Engineer – Tool Design Updated On Fri, Dec 29th, 2023 by Saurenergy Responsibilities:- Responsible for understanding, clarifying and reviewing tooling design specification, design verification & validation, design risk associated in manufacturing value chain Responsible for validation of technical design documentation such 3D CAD, 2D drawings, technical construction file, HSE risks assessment, DFMEA, Design verification procedure/report etc., adherence to relevant legislations. Validate product and process risk in a […] Read more
PLC Engineer Updated On Fri, Dec 29th, 2023 by Saurenergy Responsibilities:- The primary responsibility of this position is to carry out the detailed engineering of the SCADA-PPC system, OFC Network, SCADA & PPC installations, and configuration Creation and review of Technical Requirement Specifications, Design Descriptions Design and Troubleshoot the Network issue remotely and on-site Creation and review of Test & Verification Procedures and Reports Performs […] Read more
Vestas Nets 1.38 GW Norfolk Vanguard West Offshore Wind Project Updated On Wed, Dec 27th, 2023 by Saurenergy Vattenfall, the Swedish renewable energy company, has chosen Vestas, the Danish wind turbine manufacturer, as the preferred supplier for the Norfolk Vanguard West project in UK, which boasts a capacity of 1.38 gigawatts (GW). As part of the preferred supplier agreement for the Norfolk Vanguard West project, Vestas will provide 92 V236-15 MW offshore wind […] Read more