under component-C

TPCDOL Invites 180 MW Grid-connected Solar Pumps Under KUSUM Yojna – Component C

A joint venture between Tata Power and Odisha Government, TP Central Odisha Distribution (TPCODL) has floated a 180 MW of tender for 40,000 grid-connected solar pumps under component-C of the Pradhan Mantri Kisan Urja Suraksha Evam Utthaan Mahabhiyan (PM-KUSUM) Yojna. These grid-connected submersible pumps will be under 1, 2, 3, 5, and 7.5 horsepower (HP). […]

Read more
      SUBSCRIBE NEWS LETTER
Scroll