Total capacity

NTPC Achieves 76 GW Capacity, Adds 4 GW In FY24

NTPC, at its annual investor’s meeting, announced it has attained a 76 GW installed capacity by June end, of 2024. The company added 4 GW of capacity in FY24, with 21 GW currently under construction and 26 GW under planning. The latest addition was the completion of a small but prestigious 40 MW project at […]

Read more

April ALMM List-As Capacity Touches 44.6 GW, First Solar Makes Entry

The latest released Approved List Of Module Manufacturers (ALMM), released by the Ministry of New and Renewable Energy (MNRE) on April 29 pegged the total enlisted module manufacturing capacity at 44.6 Gigawatt (GW). This is as against the earliest enlisted capacity of 41.5 GW.  Accounting for a significant part of the jump in the domestic […]

Read more

India’s Solar Capacity Touches 72 GW, Rajasthan Takes The Lead

India’s total installed capacity of solar power has touched 72 GW. The updated energy data from the Ministry of New and Renewable Energy (MNRE) was shared on its website. The MNRE data states that the largest capacity came from ground-mounted solar. The latest data said that the Ground-mounted solar capacity stood at the highest of 55 GW. The biggest beneficiary state […]

Read more

Updated ALMM Manufacturer List For September

The ALMM (Approved List of Module Manufacturers) list for Indian domestic manufacturers has been updated by the Ministry of New And Renewable Energy (MNRE) once again after last month’s (August 2022) list. This latest update lists (September 2022) 75 companies in total, including 8 new module manufacturers with a cumulative capacity of 1,411 MW. Overall […]

Read more

August ALMM Brings 4 GW Fresh Capacity Along with 8 New Manufacturers

The ALMM (Approved List of Module Manufacturers) list for Indian domestic manufacturers has been updated by the ministry of new and renewable energy. The latest update lists 66 companies in total, including 8 new module manufacturers with a cumulative capacity of 3,976 MW. Overall capacity has risen to just over 18 GW now. Rajasthan Electronics […]

Read more

April 2022 ALMM List. 10 New manufacturers, 1.2 GW Fresh Capacity Approved

The Ministry of New And Renewable Energy (MNRE), in keeping with its regular updates to the ALMM list (Approved List of Module Manufacturers), released the newest update to the list on April 5. The updated list has 10 new manufacturers, besides an additional 100 MW capacity for Tata Power and 711 MW for  Premier Energies. […]

Read more
      SUBSCRIBE NEWS LETTER
Scroll