NGEL Invites EoI For 4 MW/12 MWh Solar Plus BESS Project In Great Nicobar Updated On Wed, Mar 12th, 2025 by Saurenergy NTPC Green Energy Limited (NGEL), an NTPC subsidiary, has issued a tender to build a solar plant with a Battery Energy Storage System (BESS) at Great Nicobar Island (GNI), India. NGEL through this EoI targets building a tentative planned capacity of up to 5 MW for the solar plant with a BESS capacity of up […] Read more
SECI Issues 2.7 MW Floating Solar Tender With BESS In Lakshadweep Updated On Thu, Mar 6th, 2025 by Saurenergy Soon after announcing plans to develop grid-connected Floating Solar PV (FSPV) projects at the beginning of 2025, SECI has now released a tender to build such projects in Lakshadweep. These projects will be located in two locations within the union territory —Agatti and Kavaratti—and include an optional Battery Energy Storage System (BESS). SECI has set […] Read more
Lakshadweep Opens Bids For Hybrid Rooftop Solar Project Updated On Wed, Mar 5th, 2025 by Saurenergy The Lakshadweep Administration, Union Territory (UT) Kavaratti Electricity Department has invited online bids to develop hybrid rooftop solar power plants with Battery Energy Storage System (BESS). The last date for bids submission is March 21st, 2025. The selected bidder will be responsible for, “Supply, Installation, Testing, Commissioning and Operation and Maintenance of 2,107 kW Hybrid […] Read more
PM-KUSUM Comp A: JDVVNL Issues Tender To Build 101.15 MW Solar Projects Updated On Mon, Mar 3rd, 2025 by Saurenergy Jodhpur Vidyut Vitran Nigam Limited (JDVVNL) has issued Expression of Interest (EoI) invite proposal to build a total 101.15 MW grid-connected solar project under PM-KUSUM Comp-A. It has sought bids until March 7, 2025 JDVVNL latest tender includes the work of design, survey, supply, installation, testing, commissioning, operation & maintenance for 25 years from Commmercial […] Read more
Bihar Issues Tender To Build 116 MW Solar Project With 50.5 MW BESS Updated On Mon, Mar 3rd, 2025 by Saurenergy The Chief Engineer (Generation) of Bihar State Power Generation Company has issued an e-tender to select an EPC contractor for the development of a 116 MW (AC) solar project integrated with a 50.5 MW, 4-hour Battery Energy Storage System (BESS) (minimum 241 MWh capacity). The tender specifies that online submission will commence on March 19, […] Read more
NTPC REL Issues 900 MW Wind Energy Tender At Andhra Pradesh With BoS Package Updated On Mon, Mar 3rd, 2025 by Saurenergy NTPC Renewable Energy (NTPC REL), a subsidiary of NTPC, has issued a tender for the Balance of System (BoS) package of an ISTS-connected wind energy project with a nominal capacity of 900 MW at Anantapur in Andhra Pradesh. It is accepting bids until April 3, 2025. NTPC REL, in its brief scope of work, mentions […] Read more
NVVN Seeks Developers To Build 1000 MWh BESS Updated On Fri, Feb 28th, 2025 by Saurenergy NVVN, an NTPC subsidiary, has issued a tender for setting up a Battery Energy Storage System (BESS). This project will provide an energy storage facility to NVVN for charging and discharging the BESS on an “on-demand” basis in Rajasthan. The BESS would be developed to the requirements of Rajasthan Urja Vikas (RUVITL/ Buying Entity/ End […] Read more
NVVN Issues 250 MW/1000 MWh BESS Tender With VGF Support Updated On Tue, Feb 25th, 2025 by Saurenergy NVVN, a wholly owned subsidiary of NTPC Limited, has issued a tender for a 250 MW/1000 MWh standalone Battery Energy Storage System (BESS) with Viability Gap Funding (VGF) support. The tender includes a greenshoe option for an additional capacity of up to 250 MW/1000 MWh. It has set March 24, 2025 NVVN has been nominated […] Read more
SJVN Floats 375 MW/1500 MWh BESS Tender For UP Project Updated On Mon, Feb 24th, 2025 by Saurenergy SJVN has recently issued a tender seeking bids from developers to build a 375 MW/1500 MWh standalone Battery Energy Storage System (BESS) in Uttar Pradesh. The tender also offers Viability Gap Funding (VGF) under Tariff-Based Competitive Bidding (TBCB) on a Build-Own-Operate (BOO) basis. SJVN is accepting bids until March 28, 2025. The project aims to […] Read more