CERC Grants Extension of Time for Drawal of Start-Up Power to NTPC Updated On Mon, Feb 13th, 2023 by Saurenergy The CERC has given its green signal to a petition filed by NTPC seeking permission to allow drawal of start-up power for Unit-I (800 MW) of Telangana Ph-I (2X800 MW) from the grid beyond the period of fifteen months (after 15.2.2023). NTPC shared that the Telangana (steam-based thermal power station) STPS consists of two units […] Read more