Tata Power Delhi Distribution Invites RFS for 255 MW of Hybrid Projects Updated On Fri, Sep 2nd, 2022 by Saurenergy Tata Power Delhi Distribution (TPDDL) has invited a request for selection (RfS) for the setting up of 255 MW wind-solar hybrid power projects with a greenshoe option for an additional 255 MW across India. The projects will be developed using a build-own-operate model. Out of the total 255 MW project capacity, Tata Power-DDL needs 85 […] Read more
KSEB Floats 340 MW of Solar, Wind, Hydropower Tender Updated On Fri, Sep 2nd, 2022 by Saurenergy Kerala State Electricity Board (KSEB) has floated a tender for 340 MW cumulative capacity. This tender capacity includes solar (140MW), wind (100MW), and hydropower (100 MW) on a short-term basis to meet its Renewable Purchase Obligations (RPO) which will help achieve the renewable target from November 1, 2022 to May 31, 2023. According to the […] Read more
Arctech Launches First Dual Row Solar Tracker Updated On Fri, Sep 2nd, 2022 by Saurenergy Solar tracker manufacturer, Arctech has successfully launched its latest Dual Row Solar Tracker SkyWings. According to the company, SkyWings is the first twin-row solar tracker in the world with a multi-point drive mechanism, made possible by the proprietary bidirectional slew drives. According to Arctech, SkyWings combines the benefit of two-row trackers with the high stiffness made […] Read more
Canadian Solar Wins 253 MWp Solar, 1,000 MWh BESS Project in Chile Updated On Fri, Sep 2nd, 2022 by Saurenergy Solar PV modules manufacturer and large scale solar project developer Canadian Solar has announced that the company has been awarded a 253 MWp solar plus 1,000 MWh battery energy storage project called ‘Zaldivar Project’ in Chile’s public tender held by Chile’s Energy National Commission (CNE) in July 2022. The official statement of Canadian Solar held […] Read more
GSECL Invites Bids for 30 MW Grid-Connected Solar Projects in Gujarat Updated On Fri, Sep 2nd, 2022 by Saurenergy Gujarat State Electricity Corporation Limited (GSECL) has floated three tenders to establish three solar power plants in three different locations in Gujarat with a cumulative capacity of 30 MW grid-connected solar. Each plant will be of 10 MW of capacity. The projects will be implemented in Amreli, Surendranagar, and Rajkot. The last date for submitting […] Read more
America’s First Solar Invests up to $1.2 Billion in Scaling Production by 4.4 GW Updated On Thu, Sep 1st, 2022 by Saurenergy First Solar, a US-based manufacturer of solar panels, has announced plans to invest up to $1.2 Billion in scaling the production of photovoltaic (PV) solar modules that are made in America and are responsibly produced. By 2025, the investment is expected to increase the company’s capacity to manufacture solar modules built in the US for […] Read more
MAHAGENCO Invites EOI for 600 MW Solar Projects in Maharashtra Updated On Tue, Aug 30th, 2022 by Saurenergy Under the “Mukhyamantri Saur Krishi Vahini Yojna,” the Maharashtra State Power Generation Company (MAHAGENCO) has invited an Expression of Interest to establish six solar power plants in six different regions of Maharashtra with a cumulative capecity of 600 MW. Each plant has 100 MW of capacity. The projects will be implemented in Nagpur, Amravati, Aurangabad, […] Read more
IRCON Renewable Power Invites Bids for 500 MW Solar Project in Karnataka Updated On Tue, Aug 30th, 2022 by Saurenergy IRCON Renewable Power (IRPL) has floated a tender for engineering, procurement, and construction (EPC) work with a 220 kV substation for 500 MW of grid-connected solar power projects at Pavagada in Karnataka. The last date for submitting the online bid is September 20, 2022, and the bids will be opened on the same day. This […] Read more
REIL Issues Tender for Setting UP 100 MW SPV Module Manufacturing Line Updated On Tue, Aug 30th, 2022 by Saurenergy A joint venture between the Government of India and the Government of Rajasthan, Rajasthan Electronics and Instruments Limited (REIL) issues tender/ has requested a bid to set up a 100 MW automatic solar module manufacturing line. This Automatic Solar Photovoltaic (SPV) module manufacturing line is on turnkey basis. Within seven months after the purchase order’s date, […] Read more