MCL Invites Bids For 20 MW (AC) & 28 MW Solar Proj. In Orissa Updated On Fri, May 17th, 2024 by Saurenergy Mahanadi Coalfields Limited (MCL) invites bids for the construction of solar PV power plant for its captive consumption in Lakhanpur and Jagannath Area (in Orissa). MCL has approved the preparation of a detailed project report (DPR) under CAPEX mode for the development of 20 MW (AC)/28 MW (DC) solar PV power plants in the above-mentioned […] Read more
HPCL Tenders For Solar Power Plants At Three Locations Updated On Mon, Jun 14th, 2021 by Saurenergy PSU oil maor and ONGC subsidiary Hindustan Petroleum Corporation Limited (HPCL) has issued a tender for the supply of solar PV power plants at three different locations of HPCL. The scope of work includes operation & maintenance of the solar PV plants immediately after successful commissioning at Vadodara Terminal, Bihta in Bihar, and Kanpur Terminal, […] Read more
Marubeni and EGCB to Jointly Develop Feni Solar Plant in Bangladesh Updated On Mon, May 24th, 2021 by Saurenergy Marubeni Corporation (hereinafter, “Marubeni”) signed a Memorandum of Understanding (hereinafter, “MoU”) with Electricity Generation Company of Bangladesh Limited (hereinafter, “EGCB”), an electricity and utility company owned by the Bangladesh Development Board (hereinafter, “BPDB”). The MoU is regarding the joint development of the 100MW Solar PV Power Plant Project in Chittagong, Feni, southeast of People’s Republic […] Read more
BHEL Issues Tender for Detailed Study of NTPC’s 22 MW Floating Solar Plant Updated On Thu, Dec 12th, 2019 by Saurenergy The last date and time for the bid submission is December 27, 2019 at 1:00 p.m. Country’s largest power generation equipment maker Bharat Heavy Electricals Ltd (BHEL) has issued tender seeking bids for detailed investigation and survey of a proposed project site of 22 MW floating solar power plant in Kerala. The last date and […] Read more
SECI Revises Bid Submission Date for 1.95MW Solar, 1.2GW Wind Projects Updated On Fri, Nov 22nd, 2019 by Saurenergy State-owned Solar Energy Corporation of India (SECI) has extended the bid submission deadline for its two renewable energy projects i.e. 1.95 MW solar energy project and 1200 MW wind project. The last date for submitting bids for 1200 MW ISTS connected wind power projects (Tranche-IX) has been extended till December 05, 2019. However, the last […] Read more
TENDER FOR DESIGN, ENGINEERING, PROCUREMENT, SUPPLY, CONSTRUCTION, ERECTION, TESTING, COMMISSIONING AND O&M OF 50 MW (AC) SOLAR PHOTO VOLTAIC POWER PLANT AT KASARGOD SOLAR PARK, KERALA Updated On Fri, Feb 8th, 2019 by Saurenergy This has reference to the RfS No. SECI/C&P/NIT/2019/THDC50 dated 08/02/2019 regarding Design, Engineering, Procurement, Supply, Construction, Erection, Testing, commissioning and O&M of 50 MW (AC) Solar PV Power Plant at Kasargod Solar Park, Kerala The RfS document has been uploaded on www.tcil-india-electronictender.com (Only viewed on Microsoft Internet explorer 10.x or above browser) and https://eprocure.gov.in/cppp/. Prospective bidders are requested to refer to TCIL […] Read more
PRE-BID MEETING : SELECTION OF SOLAR POWER DEVELOPERS FOR SETTING UP OF 3GW ISTS CONNECTED SOLAR PV POWER PLANT LINKED WITH SETTING UP OF 1.5GW (PER ANNUM) SOLAR MANUFACTURING PLANT UNDER GLOBAL COMPETITIVE BIDDING (PHASE-II) Updated On Wed, Feb 6th, 2019 by Saurenergy This has reference to the RfS No. SECI/C&P/RfS/1.5GW MANUFACTURING/P-2/012019 regarding the RfS Selection of Solar Power Developers for Setting up of 3GW ISTS Connected Solar PV Power Plant linked Setting up of 1.5GW (Per Annum) Solar Manufacturing Plant under Global Competitive Bidding (Phase-II). The Pre-Bid Meeting has been rescheduled as per following details Date : […] Read more
Amendment-IV: Selection of Solar Power Developers for Setting up of 10GW ISTS Connected Solar PV Power Plant Linked 3GW pa Solar Manufacturing Plant Under Global Competitive Bidding (Phase-I) Updated On Fri, Nov 2nd, 2018 by Saurenergy This has reference to the RfS No. SECI/C&P/RfS/5GW MANUFACTURING/P-1/052018 dated 25.05.2018 regarding Selection of Solar Power Developers for Setting up of 10GW ISTS Connected Solar PV Power Plant linked with 3GW (Per Annum) Solar Manufacturing Plant under Global Competitive Bidding (Phase-I). The Amendment-IV to RfS documents have been uploaded on www.tcil-india-electronictender.com (Only viewed on Microsoft Internet explorer 10.x or above browser) and […] Read more
Amendment 02 for Setting up of 02 mw Solar Power Project with 01 mwh BESS at Kaza, Himachal Pradesh Updated On Tue, Oct 30th, 2018 by Saurenergy This has reference to the RfS No. SECI/C&P/KAZA/042018 Dated 31.07.2018 for Setting up of 2 MW Solar PV power plant with 01 MW BESS at KAZA, HIMACHAL PRADESH. Tender for Design, Engineering, Supply, Construction, Erection, Testing, Commissioning including 5 Years Plant O&M of 2 MW (AC) Solar PV Power Plant with 01 MW BESS at KAZA, […] Read more