HPPCL Tender for Consultancy for Solar Projects Across Himachal Pradesh Updated On Mon, Jan 30th, 2023 by Saurenergy The Himachal Pradesh Power Corporation Ltd. (HPPCL) now invites bids for the hiring of a consultant/consultancy firm to provide the consultancy services for preparation of Site/Pre Feasibility Report (PFR) and Detailed Project Report (DPR) for grid-connected Ground Mounted Solar Power Projects in Himachal Pradesh. The tender held that these solar power projects will come up […] Read more
Airports Authority of India Floats 8 MW Solar Tender in Hubballi Airport, K’taka Updated On Thu, Dec 15th, 2022 by Saurenergy The Airports Authority of India has invited bids for the supply of an 8 MW capacity solar power project in Hubballi Airport to feed all airports in Karnataka. The last date for submitting the bid for this 8 MW solar power project is January 04, 2022, till 06:00 pm & bids will be opened on […] Read more
KREDL Floats Tender for 2 MW Solar Plant with 4.5 MW Storage System Updated On Tue, Dec 13th, 2022 by Saurenergy Karnataka Renewable Energy Development Limited (KREDL) has invited a Request for Proposal (RFP) for the supply of a 2 MW (AC) Solar PV Power Plant (2.2 MWp DC) with 4.5 MWh Battery Energy Storage System having 12 years Plant O&M at Pavagada Ultra Mega Solar Park of Tumakuru District in Karnataka. The last date for […] Read more
Airports Authority of India Floats 1 MW Solar Tender for Begumpet Airport, Hyderabad Updated On Fri, Nov 18th, 2022 by Saurenergy The Airports Authority of India has invited bids for the supply of a 1 MW capacity solar power project at Begumpet Airport, Hyderabad. The last date for submitting the bid for this 1 MW solar power project is December 13, 2022, till 06:00 pm & bids will be opened on December 15, 2022, at 11:00 […] Read more
Govt Green Energy Mission Gets Fillip with BEL’s EV Charging Station Updated On Tue, Oct 11th, 2022 by Saurenergy In a bid to promote the Government of India’s green energy drive, Navratna Defence PSU Bharat Electronics Ltd (BEL), in collaboration with Maharatna PSU Hindustan Petroleum Corporation Ltd (HPCL), has set up a fast Electric Vehicle (EV) charging station at the HPCL Retail Outlet at Amravati Enclave near Pinjore on the Chandigarh-Shimla Highway. The charging […] Read more
AI Powered Solar Startup Renkube Raises 2.4 Cr in Seed Round By CIIE.CO Updated On Wed, Aug 17th, 2022 by Saurenergy Bangalore-based renewable energy-focused deep tech AI startup Renkube has announced that it has secured Rs. 2.4 crores ($300K) in a seed round led by CIIE.CO. JITO Angel Network and K4 Forum Mumbai Network also participated in this round. Halliburton Labs, a wholly owned subsidiary of Halliburton Company is participating via Renkube’s selection to its clean […] Read more
KREDL Issues RFP For 5 MW Solar Plus Battery At Karnataka Solar Park Updated On Tue, Aug 16th, 2022 by Saurenergy Karnataka Renewable Energy Development Limited (KREDL) has invited a Request for Proposal (RFP) 5MW (AC) Solar PV Power Plant (7 MWp DC) with 5MW / 16 MWh Battery Energy Storage System having 10 years Plant O&M at Pavagada Ultra Mega Solar Park of Tumakuru District in Karnataka. The last date for submitting the online bid […] Read more
AAI Decarbonises 14 Airports With 100% Renewable Energy Updated On Fri, Jul 22nd, 2022 by Saurenergy 14 airports out of 125 airports, falling under the Airport Authority of India, have achieved decarbonisation with 100% renewable energy. Running on renewable energy to meet the operational requirements, the list of carbon free airports includes Tezu airport, Kangra airport, Kullu airport, Shimla airport, Jammu airport, Srinagar airport, Leh airport, and Imphal airport, Dimapur airport, Puducherry […] Read more
Bangalore Metro Rail Floats Tender For 20 MW Of Grid Connected Rooftop Solar System Updated On Mon, Jul 4th, 2022 by Saurenergy Bangalore Metro Rail Corporation Ltd (BMRCL) has invited bids for a grid-connected rooftop solar photovoltaic system of 20 MW. This tender includes design, engineering, supply, construction, erection, testing, commissioning, and grid synchronization. The power developer will be responsible for O&M, warranty for 25 years under RESCO Model. The last date to submit the bid is […] Read more