Amsterdam’s Largest EV Charging Network to Run on RE Updated On Mon, May 13th, 2019 by Saurenergy The innovative solution enables faster charging, maximal use of renewable electricity and more efficient use of the electric grid in Amsterdam. Vattenfall and the City of Amsterdam, have together launched Flexpower, the largest public smart charging network for electric vehicles in Amsterdam. Operated by Vattenfall, a total of 456 charging stations with 912 charging points […] Read more
E.on Posts Lower EBIT and Net Income For First Quarter of 2019 Updated On Mon, May 13th, 2019 by Saurenergy The Renewables segment’s adjusted EBIT rose by 23 percent year on year, from €171 million to €211 million. Thanks to commissioning of offshore wind farms in Germany and the UK and an onshore wind farm in the US. The Germany-based electric utility company, E.On, with its core business in Energy Networks, Customer Solutions and Renewables […] Read more
Second Attempt Yields Lower Tariffs in Gujarat Solar Auction Updated On Fri, May 10th, 2019 by Saurenergy GUVNL has awarded solar projects worth 500 MW to four developers in the Raghanesda Solar Park after offering 700 MW. The discom received winning bids which were Rs 0.18/kWh less than the cancelled auction held in January. In its second attempt to auction solar projects at the Raghanesda Solar Park in the state, the Gujarat […] Read more
Vikram Solar Successfully Appraised by Black & Veatch Updated On Fri, May 10th, 2019 by Saurenergy After a detailed review of the module design and bill of materials for module configurations, the Kansas based firm came to a positive conclusion that Vikram Solar modules successfully met the requirements of international standards in those respects. Vikram Solar, one of India’s leading module manufacturers and prominent rooftop solar & EPC solutions provider, has […] Read more
Himachal Pradesh Issues Draft Amendment Regulations For Deviation Settlement Updated On Fri, May 10th, 2019 by Saurenergy The Himachal Pradesh Electricity Regulatory Commission (HPERC) has issued draft amendments for its regulations on deviation settlement mechanism. In its notification, the commission noted that the proposed amendments have been introduced to align the state’s regulations with the Central Electricity Regulatory Commission’s (CERC) latest and fifth draft amendments to the principal deviation settlement mechanism regulation […] Read more
Panasonic and GS Solar to Collaborate on PV Technology Updated On Fri, May 10th, 2019 by Saurenergy Japanese multinational electronics conglomerate, Panasonic has reached a collaboration and acquisition agreement with Chinese solar energy solutions provider GS-Solar Company Ltd. in the field of photovoltaic technology. Under the agreement, GS-Solar will acquire Panasonic’s solar manufacturing subsidiary, Panasonic Energy Malaysia, while establishing a new company with Panasonic. With the Chinese firm holding a 90 percent […] Read more
CERC Finds Rs 3.60/kWh as the National Average Power Purchase Cost Updated On Fri, May 10th, 2019 by Saurenergy The APPC shall be applicable during FY 2019-20 and until further orders for the purpose of deviation settlement in respect of the open access and captive wind and solar generators fulfilling the requirement of regional entities. The Central Electricity Regulatory Commission (CERC) has found the Average Power Purchase Cost (APPC) at the national level to […] Read more
United States Hits 2 Mn Solar Installations, 4 Mn Expected by 2023: Report Updated On Fri, May 10th, 2019 by Saurenergy The report forecasts that there will be 3 million installations in 2021 and 4 million in 2023, continuing the swift rise of solar. A new report has revealed that the United States has crossed the 2 million solar PV installations landmark. Progressing at an astonishing rate, the second million installations came in a period of […] Read more
NTPC Ordered to Release Bank Guarantees of 3 IPPs in Rajasthan Updated On Thu, May 9th, 2019 by Saurenergy The commission ruled that the retention of the performance bank guarantees by NTPC was illegal and arbitrary. NTPC Ltd. has been ordered by the Central Electricity Regulatory Commission (CERC) to release the performance bank guarantees (PBG) of three independent power producers (IPP) operating in the Bhadla Solar Park in Rajasthan. The commission responded in response […] Read more