SECI’s 630 MW FDRE Project Moves Ahead With Adoption of Tariff Updated On Fri, Mar 7th, 2025 by Saurenergy A journey that started in September 2023 through the issue of a tender for Renewable energy with energy storage for 1260 MW of Firm and Dispatchable Power (FDRE) has moved a step closer to fruition with the adoption of Tariffs by the CERC. The five winning firms in the tender had finally been awarded capacities […] Read more
SECI Issues 2.7 MW Floating Solar Tender With BESS In Lakshadweep Updated On Thu, Mar 6th, 2025 by Saurenergy Soon after announcing plans to develop grid-connected Floating Solar PV (FSPV) projects at the beginning of 2025, SECI has now released a tender to build such projects in Lakshadweep. These projects will be located in two locations within the union territory —Agatti and Kavaratti—and include an optional Battery Energy Storage System (BESS). SECI has set […] Read more
JSW Energy Adds 159 MW Wind Power, Total Capacity At 2.8 GW Updated On Tue, Mar 4th, 2025 by Saurenergy Mumbai-based JSW Energy has added 159 MW of new wind power capacity this quarter, bringing its total operational capacity to 8,400 MW. This expansion comes ahead of the wind season and can help meet the rising energy demand during the upcoming peak period. Following this addition, the company’s total operational wind capacity now stands at […] Read more
JSW Energy Wins 125 MW/500 MWh BESS Tender From SECI At ₹441,000/MW/Month Updated On Thu, Feb 27th, 2025 by Saurenergy JSW Energy has recently secured a 125 MW/500 MWh standalone battery energy storage system (BESS) tender from the Solar Energy Corporation of India (SECI). JSW won the tender at ₹441,000/MW/month. SECI floated this tender in December 2024 and declared it within two months. As per the tender, SECI, after receiving interest from the Kerala State […] Read more
SECI, MP Govt To Build 200 MW Dhar Solar Project With 1000 MWh BESS Updated On Tue, Feb 25th, 2025 by Saurenergy Solar Energy Corporation of India Limited (SECI), a Navratna CPSU under the Ministry of New & Renewable Energy, signed a Memorandum of Understanding (MoU) with the Madhya Pradesh government for a 200 MW solar project in Dhar. This project is part of the CPSU Scheme and a 1,000 MWh Battery Energy Storage System (BESS) project […] Read more
CERC Adopts tariff For SECI’s 1200 MW Wind Solar Hybrid Projects Updated On Thu, Feb 20th, 2025 by Saurenergy In an order dated February 18, the Central Electricity Regulatory Commission has adopted the proposed tariffs for SECI’s 1200 MW Hybrid projects comprising wind and solar energy under Tranche VIII. SECI had issued the letter of awards to the winning bidders on June 20, 2024. The projects will now await the signing of formal PPAs, […] Read more
SECI Issues Tender To Build 500 MW Solar Project Updated On Fri, Feb 14th, 2025 by Saurenergy The Solar Energy Corporation of India (SECI) has released a 500 MW (Tranche-XIX) ISTS-connected solar tender. SECI has invited bids for the project until March 17, 2025, for soft copy submission and March 19, 2025, for hard copy submission. A plain vanilla solar tender has become a bit of a rarity in recent times, making […] Read more
Renewable Energy Tariffs Drop 50% Since FY 2013-14: Govt Updated On Thu, Feb 6th, 2025 by Saurenergy The Ministry of New and Renewable Energy (MNRE) said that renewable energy tariffs in the country have gone down up to 50% since 2013-14. The information was furnished by the ministry before the Parliament in a written reply. Mentioning the range of tariff rates, the MNRE Minister Pralhad Joshi said, “The range of tariffs discovered […] Read more
Module Supply: SECI Awards 400 MWp Module Order to Alpex, Tata Power Solar Updated On Sat, Feb 1st, 2025 by Saurenergy The Solar Energy Corporation of India (SECI) recently announced Alpex Solar and Tata Power Renewable Energy Subsidiary, Tata Power Solar (TP Solar) winners of its 400 Mwp modules tender. The tender intends to supply these solar modules at a Ramagiri project located in Andhra Pradesh. The tender for this project was released in November 2024 […] Read more