Rihand Floating Solar Project Hobbles Ahead, With UPERC Approval On Tariffs Updated On Tue, Aug 3rd, 2021 by Saurenergy Plans for a floating solar project, totaling 150 MW on the Rihand reservoir (linked to Rihand Dam) have finally crossed an important milestone, with the UPERC (Uttar Pradesh Electricity Regulatory Commission) finally approving the same, although not without some mild admonitions to SECI. The order was dated July 30, 2021, and uploaded later to the […] Read more
CERC Shunts SP Infra Plea On Rihand Floating Solar UPERC’s Way, Citing Jurisdiction Updated On Tue, May 25th, 2021 by Saurenergy The Central Electricity Regulatory Commission (CERC), in an order that will hopefully show the way to many similar pleas, has refuse to consider a plea by Rihand Floating Solar Private Limited regarding return of its bank guarantees for the said project from SECI. Rihand Floating Solar is a special purpose vehicle set up by Shapoorji […] Read more
CERC Rejects SECI Plea For Adopting Tariffs for 150 MW Rihand Floating Solar Project Updated On Mon, Apr 19th, 2021 by Saurenergy The floating solar project at Rihand Dam, where SECI, as the nodal agency had duly completed the auction process to arrive at a price of Rs 3.29 /unit looks set to be further delayed with the central regulator, Central Electricity Regulatory Commission rejecting the tariff adoption plea. The project has been widely touted as India’s […] Read more
Floating Solar On Fast Lane With Start of Work On 100 MW NTPC Ramagundam Project Updated On Mon, Jun 22nd, 2020 by Saurenergy With Work finally starting on NTPC Ramagundam’s Floating solar project, with a planned capacity of 100 MW, floating solar is back in focus. The Ramagundam project is being built on the balance reservoir of NTPC’s Ramagundam Super Thermal Power Station, with a nameplate capacity of 2600 MW itself. The reservoir itself gets its water from […] Read more