POSTPONEMENT OF THE TENDER UPLOADING : SELECTION OF SOLAR POWER DEVELOPERS FOR SETTING UP OF 100MW (50MW X 2) GRID CONNECTED FLO Updated On Mon, Mar 26th, 2018 by Saurenergy This has reference to the NIT No. SECI/C&P/SPD/RfS/100MW FLOATING/UP/032018 published dated 16.03.2018 regarding the RfS Selection of Solar Power Developers for Setting up of 100MW (50MW x 2) Grid Connected Floating Solar Power Projects to be installed at Rihand Dam (also known as Govind Ballabh Pant Sagar Reservoir), Sonbhadra District, Uttar Pradesh. The RfS documents […] Read more
REQUEST FOR SELECTION (RFS) DOCUMENT FOR 750 MW GRID CONNECTED SOLAR PHOTO VOLTAIC POWER PROJECTS UNDER NSM PHASE II BATCH-IV TR Updated On Fri, Feb 16th, 2018 by Saurenergy REQUEST FOR SELECTION (RfS) DOCUMENT FOR 750 MW GRID CONNECTED SOLAR PHOTO VOLTAIC POWER PROJECTS UNDER NSM PHASE II BATCH-IV TRANCHE-XV IN KADAPA SOLAR PARK, ANDHRA PRADESH The extension of prebid meeting and bid submission schedule for 750 MW Grid connected solar Photo voltaic power project under NSM Phase II Batch 4 has been uploaed […] Read more
POSTPONEMENT OF THE TENDER UPLOADING : SETTING UP OF 2000MW (250MW X 8) ISTS CONNECTED SOLAR POWER PROJECTS Updated On Mon, Jan 8th, 2018 by Saurenergy This has reference to the NIT No. SECI/C&P/SPD/RfS/2000MW/122017 publisheddated 29.12.2017 regarding the RfS Selection of Solar Power Developers for Setting up of 2000MW (250MW x 8) ISTS Connected Solar Power Projects, 250MW Capacity each of 08 Nos. of Packages to be installed anywhere in India. The RfS documents for the captioned RfS which was to […] Read more