GE Renewable Energy signs first Cypress order in Spain Updated On Mon, Dec 7th, 2020 by Saurenergy GE Renewable Energy announced today that it has been selected by Azora to supply 19 Cypress onshore wind turbines for the 100 MW Cuevas de Velasco wind farm located in the Cuenca province in Spain. Azora will operate the Cypress turbines at 5.5 MW, with a rotor diameter of 158m, the most powerful ever permitted […] Read more