BHEL Issues Tender for Detailed Study of NTPC’s 22 MW Floating Solar Plant Updated On Thu, Dec 12th, 2019 by Saurenergy The last date and time for the bid submission is December 27, 2019 at 1:00 p.m. Country’s largest power generation equipment maker Bharat Heavy Electricals Ltd (BHEL) has issued tender seeking bids for detailed investigation and survey of a proposed project site of 22 MW floating solar power plant in Kerala. The last date and […] Read more
MNRE Makes Few Amendments in Provisions for DRC Updated On Tue, Dec 10th, 2019 by Saurenergy The Ministry of New & Renewable Energy (MNRE) has made few amendments in the existing provisions for the Dispute Resolution Mechanism under which disputes are considered between solar/ wind power developers and SECl/ NTPC. The amendment has been made w.r.t. fee payable in case of extension of dispute time. As per the ministry notification, all […] Read more
NTPC Tenders for 870 kW Rooftop Solar System Updated On Tue, Dec 10th, 2019 by Saurenergy NTPC has issued a tender for the commission of an 870 kW grid-connected rooftop solar PV plant NTPC Limited has issued a tender, inviting bids from eligible firms for the commission of an 870 kW grid-connected rooftop solar PV plant at the NTPC Vindhyachal Stage-2 TG Hall. The scope of work for the selected bidders […] Read more
MNRE Issues New List of DRC Members Updated On Tue, Dec 10th, 2019 by Saurenergy The Ministry of New and Renewable Energy (MNRE) on Monday has issued a new list of the members of Dispute Resolution Committee (DRC). The move came after the resignation of Anil Swarup, who is the former Coal Secretary/ School Edn. Secretary, Ex-IAS, UP: 1981, from the Dispute Resolution Committee. Now, P. K. Basu, former Agriculture […] Read more
Railways to Save Rs 121.5 Cr Yearly via Addl Power in 2 States from BRBCL Updated On Mon, Dec 9th, 2019 by Saurenergy In a bid to economize electricity bill and reduce operating costs, Indian Railways has started the flow of additional power from Bhartiya Rail Bijli Company Ltd (BRBCL) in the states of Bihar and Rajasthan. The Railway ministry said in a statement that, it had commenced the flow of additional 50 MW power, total 100 MW, […] Read more
NTPC Tenders for 500 MW Solar Projects in Maharashtra Updated On Fri, Dec 6th, 2019 by Saurenergy NTPC has tendered for the development of grid-connected solar power projects up to 500 MW in generational capacity in Maharashtra under EPC package NTPC Limited has issued a tender, inviting bids from eligible bidders for the development of grid-connected solar power projects up to 500 MW in generational capacity in Maharashtra under Engineering, Procurement and […] Read more
NTPC Issues 923MW Solar Tender under Domestic Competitive Bidding Updated On Wed, Dec 4th, 2019 by Saurenergy The last date and time for submitting bids including both Techno-Commercial Bids and Price Bids is January 03, 2020 at 2 p.m. State-run power producer NTPC has invited bids for the development of up to 923 MW of capacity grid connected solar photovoltaic (PV) projects under CPSU Scheme Phase-II (Tranche-II). As per the tender document […] Read more
Power, Solar Sector, Discoms in Focus in Parliament. Here Is What Was Said. Updated On Fri, Nov 29th, 2019 by Saurenergy The answers by Power Minister R.K. Singh in parliament yesterday, while placing on record the hard figures when it comes to the power sector and renewables, particularly solar power, also underscored the minister’s continued confidence in India meeting its renewable energy goals. We take a look at the key takeaways. The Saubhagya scheme, or the […] Read more
NTPC Tenders for Operation & Maintenance of 15 MW Solar Plant Updated On Wed, Nov 27th, 2019 by Saurenergy NTPC has issued a tender for the operation and maintenance of 15 MW solar energy plant in Singrauli NTPC Limited has issued a tender for the job contract for operation and maintenance of the firms’ 15 MW solar energy plant in Singrauli, Madhya Pradesh. The scope of work for the selected riders will include the […] Read more