NTPC REL Wins 900 MW in PFCCL 1250 MW Solar Tender Updated On Tue, Dec 26th, 2023 by Saurenergy PFCCL has announced the winners for its solar tender released a few months ago. NTPC Renewable Energy Limited has secured the bid for 900 MW capacity in the solar tender floated by PFCCL on behalf of NTPC Ltd. for the selection of 1250 MW ISTS-connected solar PV power projects in India under Flexibility Scheme. The […] Read more
NTPC REL Sets Sights on Procuring Land for 800 MW Solar Projects Updated On Mon, Dec 11th, 2023 by Saurenergy NTPC Renewable Energy (NTPC REL) has floated a tender towards the procurement of land and an Extra High Voltage (EHV) transmission system package for the development of Interstate Transmission System (ISTS)-connected 800 MW solar power projects in Maharashtra. The last date to submit bids is January 16, 2023. Bids open on the same day, that […] Read more
NTPC Looks for Power Generators for Supply of 1500 MW Solar-Wind Projects Updated On Thu, Dec 7th, 2023 by Saurenergy NTPC Ltd. has issued a tender and invited online bids from eligible bidders on Single Stage Two Envelope (that is, envelope-I: technical bid and envelope-II: financial bid) with reverse auction for the selection of hybrid power generators for the supply of 1500 MW power from ISTS connected -solar-wind hybrid power projects anywhere in India (NTPC-Tranche-IV) […] Read more
NTPC REL Floats Tender for BOS Package of 1110 MW Wind Project Updated On Thu, Nov 23rd, 2023 by Saurenergy NTPC REL invites online bids for BOS package of ISTS connected wind energy project with nominal capacity of 1110 MW capacity anywhere in Gujarat under Tranche II. The last date and time for receipt of bids comprising both techno-commercial bid and price bid is December 20, 2023. The techno-commercial bid opens on the same day, […] Read more
NTPC REL Floats Tender for BOS Package of 1200 MW Wind Projects Updated On Mon, Nov 20th, 2023 by Saurenergy The renewable energy arm of India’s largest energy conglomerate NTPC, NTPC REL has floated a tender for the BOS package of ISTS-connected wind energy projects of nominal capacity of 1200 MW with greenshoe option of upto 300 MW at Anantapur in Andhra Pradesh. The last date for receipt of bids comprising both techno-commercial bid and […] Read more
NTPC REL Floats Tender for 900 MW Solar Projects In Andhra Pradesh Updated On Thu, Nov 9th, 2023 by Saurenergy The renewable energy arm of NTPC, NTPC Renewable Energy Limited (NTPC REL) has invited online bids from eligible bidders on single stage two envelope, (viz. envelope-I: techno-commercial bid and envelope-II: price bid) for land and power evacuation package for the development of 900 MW ISTS connected solar PV projects in Kurnool, Andhra Pradesh with the […] Read more
NTPC REL Calls Bids for Supply of WTGs for 1000 MW Wind Project Updated On Wed, Nov 8th, 2023 by Saurenergy NTPC REL, the renewable energy arm of NTPC, has invited bids for the supply and installation of wind turbine generators for ISTS connected wind energy project with nominal capacity of 1000 MW in Gujarat (up to 370 WTG). NTPC REL has been proactively establishing wind projects. It recently also commissioned a 50 MW project in […] Read more
NTPC REL Announces Tender for Wind Project of 1080 MW Updated On Mon, Nov 6th, 2023 by Saurenergy NTPC Renewable Energy Limited (NTPC REL) has issued a tender inviting bids from eligible bidders on single stage two-envelope (including techno-commercial bid and price bid) basis for Balance of System package of ISTS connected wind energy project with nominal capacity of 1080 MW in Karnataka. The scope of work entails detailed design, engineering, micro-siting, manufacturing, […] Read more
NTPC REL Achieves Commercial Operation of First Wind Project of 50 MW Updated On Mon, Nov 6th, 2023 by Saurenergy NTPC Renewable Energy Limited, a wholly owned subsidiary of NTPC, has announced the commercial operation of its wind first project. The said project is for a capacity of 50 MW at Dayapar in Kachch, Gujarat. With the commissioning of this project, the cumulative installed capacity of NTPC Group has become 73,874 MW while the total […] Read more