MNRE

Vacancy in MNRE for 9 Posts of Scientists from GATE Qualified Candidates

The vacancy in MNRE will also provide science aspirants to work in the country’s premium green energy organization. Ministry of New and Renewable Energy (MNRE) has sought job applications from the Graduate Aptitude Test in Engineering (GATE) qualified candidates for filling up vacancy in MNRE for 9 posts of Scientists ‘B’ on direct recruitment base. […]

Read more

MNRE Opines Trimming Commissioning Period for Solar Projects

The developers have put up concerns over the suggestion given by MNRE as shortening the period to develop solar projects would pressurize the developers and would pose quality issues. Making the solar developers unhappy, Ministry of New and Renewable Energy (MNRE) has proposed to cut short the commissioning period for solar projects in order to […]

Read more

NIWE Conducts India’s First LiDAR Test to Track Wind Power

The Light Detection and Ranging (LiDAR) machine was placed 23 km from the coast of Gujarat for a period of 8 months. In a bid to tap the most potential source of wind power, National Institute of Wind Energy (NISE) has successfully conducted India’s first LiDAR based wind power test off the Gulf of Khambhat […]

Read more

AMU Conducts ‘Grid Connected Solar PV Rooftop’ Workshop

AMU workshop is aimed at providing basic information on solar PV rooftop and raise awareness among entrepreneurs on the concept, design and components with specific focus on technical architecture of solar PV rooftop system. Aligarh Muslim University AMU, conducts a five-day ‘Grid Connected Solar PV rooftop Workshop’ under its ‘Green Initiative’. The Department of Electrical […]

Read more

MNRE Postpones Commissioning of 7,750 MW Grid-Connected VGF Solar Projects

MNRE does not hold the developers responsible for the delay in the commissioning of solar PV projects but the supervisory authorities. Ministry of New and Renewable Energy (MNRE) has in a row extended the commissioning deadlines of 7,750 MW grid-connected solar PV power projects under different batches of viability gap funding (VGF) planned under 2nd […]

Read more

MNRE Seeks Upper Ceilings for Solar Tariffs

MNRE has asked the Solar Energy Corporation of India to follow the ‘maximum permissible tariff rule’ for capping the solar tariffs at Rs. 2.5 and Rs. 2.6 per unit respectively for both categories. Ministry of New and Renewable Energy (MNRE) has sought on the recommendations of advisers of National Solar Mission (NSM) an upper ceiling […]

Read more

Sushma Swaraj Urges Indian Diaspora to Foray Country’s Solar Power Sector

Sushma Swaraj aimed at investment opportunities in the solar power industry that are doing rounds on the back of Indian Government’s target of achieving 100 GW of solar power generation by 2022. Speaking at a panel discussion of ‘Pravasi Bhartiya Divas’, External Affairs Minister Sushma Swaraj urged the present dignitaries and the attendees from the […]

Read more

Government Regulates Time for Solar Tenders

The time regulation came in to give time gaps between the solar tenders rolled out by the government agencies in order to avoid chaos in the solar industry. Government has set schedules for the state agencies and official organizations to float solar tenders. The time regulation came in to give time gaps between the solar […]

Read more
      SUBSCRIBE NEWS LETTER
Scroll