Ensure Smooth O&M of ISTS Network During Nationwide Lockdown Updated On Fri, Apr 24th, 2020 by Saurenergy The moP has said that states must ensure smooth O&M of ISTS network and that construction work is allowed for transmission utilities during the lockdown The Ministry of Power (MoP), in view of the extension in the nation-wide lockdown until May 3, 2020, has asked that States/ UTs/ DMs, etc must ensure that there is […] Read more