“Intra-state Transmission System Green Energy Corridor (GEC) Phase- II” scheme

With formal approval, 20 GW of RE capacity on its way for green corridor

The Ministry of New and Renewable Energy (MNRE) has notified the President’s approval for the implementation of the “Intra-state Transmission System Green Energy Corridor (GEC) Phase- II” scheme, which will enable the creation of intra-state transmission infrastructure required for the power evacuation of renewable power projects in the country. The projects, which would have approx. […]

Read more
      SUBSCRIBE NEWS LETTER
Scroll