ALMM: India’s Enlisted Solar Module Capacity Touches 58 GW Updated On Tue, Oct 15th, 2024 by Saurenergy The Ministry of New and Renewable Energy (MNRE) in its latest Approved List of Models and Manufacturers (ALMM) revealed that the total enlisted Indian solar module manufacturing capacity touched 58.42 GW. The ministry earlier issued the last ALMM on September 27. In the latest list, the ministry reported an addition of around 2.09 GW of […] Read more
Avaada, Laxmi Solar, Uratom Make Entry In Latest ALMM Updated On Thu, Aug 29th, 2024 by Saurenergy India’s cumulative enlisted domestic solar module manufacturing capacity has now touched 54.70 GW, latest data from the MNRE revealed. As per the latest Approved List of Models and Manufacturers (ALMM), issued by the MNRE on August 29, India is now home to 94 enlisted solar module manufacturing factories, spread across the country. The latest list […] Read more
ALMM: India’s Solar Module Manufacturing Capacity Touches 50.8 GW Updated On Tue, Jul 9th, 2024 by Saurenergy India’s total enlisted solar module manufacturing capacity has now touched 50.8 Gigawatt (GW), the latest ALMM list issued by the Ministry of New and Renewable Energy (MNRE) revealed. The recent Approved List of Models and Manufacturers (ALMM) lists a total of 93 solar module manufacturing plants in India, against the earlier figure of 90. The […] Read more