Low-ceiling tariff by SECI gets auction postponed again for 1200 MW Hybrid Tender Updated On Mon, Oct 29th, 2018 by Saurenergy The main reason was poor response from developers, who claimed to have stayed away mainly because SECI had set a tariff ceiling for the auction at Rs 2.60 per unit, which developers felt was too low. The auction, which was to be held on October 26, is now set for November 14. SECI has postponed its […] Read more
Piyush Goyal Gets Top Prize in Energy Policy Updated On Sat, Oct 27th, 2018 by Saurenergy As former Minister of Power and Renewables, Goyal fast-tracked the electrification of 18,000 remote villages in India—bridging the country’s vast energy divide. The Kleinman Center for Energy Policy bestowed its highest award ‘Carnot Prize’ to Piyush Goyal, India’s former Minister of Power and Renewables and current Minister of Railways and Coal. As former Minister of […] Read more
Results of E-Bidding and E-RA for 1200 mw ISTS-Connected Wind Power Projects (Tranche-v) Updated On Sat, Oct 27th, 2018 by Saurenergy SOLAR ENERGY CORPORATION OF INDIA LIMITED Selection of 1200 MW ISTS-connected Wind Power Projects (Tranche-V) (RfS No: SECI/C&P/WPD/1200MW/T5/RfS/022018 dated 30.06.2018) After Technical Bid Opening After e-Reverse Auction (held on 25.09.2018) Sl. No. Bidder’s Name Capacity (MW) Bidder’s Name Bidder’s Quantity (MW) Tariff (INR/kWh) Awarded capacity (MW) 1 Alfanar Company 300 Torrent Power Limited 115 2.76 […] Read more
Extension 04 of Bid Submission of Setting up of 02 mw Solar Power Project with 01 mwh Bess at Kaza, Himachal Pradesh Updated On Sat, Oct 27th, 2018 by Saurenergy This has reference to the RfS No. SECI/C&P/KAZA/042018 Dated 31.07.2018 for Setting up of 2 MW Solar PV power plant with 01 MW BESS at KAA, HIMACHAL PRADESH. The last date of bid submission is hereby Extended till 12.11.2018 (14:00 Hrs). All Prospective Bidders are requested to stay updated from TCIL website (www.tcil-india-electronictender.com) for more details. Tender Search Code (TSC): SECI-2018-TN000026 Read more
Amendment – 4 : RFB for 160 mw Solar-Wind Hybrid Power Plant with Bess at Ramagiri, AP, India Updated On Sat, Oct 27th, 2018 by Saurenergy Employer: Solar Energy Corporation of India Limited (SECI), New Delhi, India Project: Innovation in Solar Power and Hybrid Technologies Project Contract title: Design, Engineering, Supply, Construction, Erection, Testing & Commissioning of 160 MW Solar-Wind Hybrid Power Plant with BESS including 10 Years Plant O&M under International competitive bidding at Ramagiri, Anantapur district, Andhra Pradesh, India RFB […] Read more
Tata Power Delhi Distribution Makes Prior Arrangements to Meet Peak Power Demand This Winter Season Updated On Sat, Oct 27th, 2018 by Saurenergy Tata Power Delhi Distribution (Tata Power – DDL) expects a peak demand of approximately 1500 MW in this winter season. The long term power tie ups are in place for meeting the same effectively. A total of 1650 MW of power is available from long term sources which would help in meeting the winter peak […] Read more
Waaree Energies Expands Footprint to SE Asia; Bags 60 MW Solar Project in Vietnam Updated On Fri, Oct 26th, 2018 by Saurenergy The company will be using its high efficiency mono-crystalline panels for this project. One of the leading solar PV manufacturer Waaree Energies has secured a 60 MW ground mounted on-site solar project in Vietnam. With the Turnkey Engineering, Procurement and Construction (EPC) contract, along with Operations and Maintenance (O&M), the project also marks the company’s […] Read more
Renew Power Partners with CII in its ‘Clean Air Better Life’ Initiative for Punjab Updated On Fri, Oct 26th, 2018 by Saurenergy Under this program, the company has committed to support 500 farmers from Ludhiana district and provide them access to climate smart technological solutions for farm residue management. India’s one of the leading renewable energy IPP, ReNew Power has collaborated with Confederation of Indian Industries (CII) in its ‘Clean Air Better Life’ initiative to help Punjab farmers; with alternative stubble […] Read more
Karnataka CM Instructed Officials to Ensure No Interruption in Power Supply Updated On Fri, Oct 26th, 2018 by Saurenergy The Minister asked officials to utilise hydro and solar power facilities to avoid load-shedding. On the other hand Kumaraswamy held the central government responsible for the power crisis. Karnataka Chief Minister H D Kumaraswamy after reports of a looming power crisis has directed the concerned officials to ensure there was no interruption in power supply in […] Read more