GUVNL Floats Tender for 250 MW/500 MWh Battery Energy Storage Systems Updated On Fri, Dec 1st, 2023 by Saurenergy Gujarat Urja Vikas Nigam Limited (GUVNL) has issued a Request for Selection (RfS) for setting up of pilot projects of 250 MW/500 MWh standalone Battery Energy Storage Systems in Gujarat under Tariff-Based Global Competitive Bidding (Phase-II). The projects will be established under the BOO model. Selection of Battery Energy Storage Systems projects for a total […] Read more
Mahindra Susten Signs PPA with GUVNL at INR 2.7250 INR / KWh for 200 MW Solar Project Updated On Wed, Aug 9th, 2023 by Saurenergy Mahindra Susten has entered into a Power Purchase Agreement (PPA) with GUVNL (Gujarat Urja Vikas Nigam Limited). The tender was issued by GUVNL for 500 MW Phase XIX ISTS project, while Mahindra Susten won project size of 100 MW with 100 MW greenshoe capacity. The total capacity won by the firm is 200 MW. The […] Read more
KPI Green Energy Emerges Winner for 200 MW Project in GUVNL Tender Updated On Fri, Aug 4th, 2023 by Saurenergy KPI Energy has emerged as the winner in the Gujarat Urja Vikas Nigam Limited (GUVNL) tender for development of a solar photovoltaic power project. The firm had participated in the competitive bidding process for the “Purchase of power through competitive bidding process vide RFS No. GUVNL / 800 MW / Khavda / Solar (PhaseXX)” issued […] Read more
GUVNL Invites Bids For 800MW Solar Projects With Greenshoe Option Updated On Tue, May 23rd, 2023 by Saurenergy Gujarat Urja Vikas Nigam (GUVNL) has invited bids for the purchase of power through a competitive bidding process (followed by reverse e-auction) from the 800 Megawatt (MW) Grid-Connected Solar Photovoltaic Power Projects to be set up in Gujarat State Electricity Corporation Ltd’s Solar Park at Khavda (GSECL Stage 2) with a Greenshoe option of additional […] Read more
GUVNL Tender For Procurement Of 500 MW Wind Power Updated On Mon, Mar 20th, 2023 by Saurenergy Gujarat Urja Vikas Nigam (GUVNL) has issued tender inviting bids to procure green power from 500 MW of grid-connected wind projects (Phase V) with a greenshoe option of an additional capacity of up to 500 MW. GUVNL has kept the last day of bid submission on April 11, 2023 and the bids will be opened […] Read more