BSUL Floats Tender for Consultant for 1200 MW Jalaun Solar Park Updated On Tue, Oct 4th, 2022 by Saurenergy A Joint Venture of NHPC (National Hydro Electric Power Corporation) Limited and Uttar Pradesh New and Renewable Energy Development Agency (UPNEDA), Bundelkhand Saur Urja Limited (BSUL) has invited bids for the “Engagement of an expert consultant for providing Project Management Consultancy (PMC) services to Bundelkhand Saur Urja Limited for implementation of Jalaun Solar Park 1200 […] Read more
UPMRCL Invites Bids For Solar Rooftop E-Tenders For Kanpur Metro Project Updated On Fri, Aug 19th, 2022 by Saurenergy Uttar Pradesh Metro Rail Corporation (UPMRCL) has floated an E-Tender to install and commission 1 MW of rooftop solar systems at the Kanpur metro project. The last date for submitting the online bid is September 28, 2022, till 10:00 am. Bids will be opened on September 29, 2022, at 03:00 pm. This MGVCL 42.8 MW […] Read more
Bundelkhand Issues 1200 MW Tender for PMC Services of Jalaun Solar Park in Uttar Pradesh Updated On Fri, Aug 19th, 2022 by Saurenergy Bundelkhand Saur Urja Limited (BSUL) has invited bids for a 1200 MW solar tender for the engagement of an expert consultant for providing Project Management Consultancy (PMC) services to Jalaun Solar Park. The last date for submitting the online bid is September 03, 2022, till 10:00 am. Bids will be opened on the same day […] Read more
MGVCL Issues Tender For Solar Projects Under KUSUM Program Updated On Tue, Aug 16th, 2022 by Saurenergy Madhya Gujarat Vij Company Ltd. (MGVCL) has invited bids for the supply of 42.8 MW of solar projects in Gujarat. This solar project is a grid-connected feeder level solar power project and the associated power line under Component C of the Pradhan Mantri Kisan Urja Suraksha evam Utthaan Mahabhiyan (PM-KUSUM) program. The last date for […] Read more
Under KUSUM Scheme, Govt. to Provide 2.75 Million Solar Pumps to Farmers Updated On Fri, Jun 8th, 2018 by Saurenergy “Initially the solar-pumps will be distributed as per the demand from each region but at the later stage, if required, we will provide more pumps,” power minister R K Singh. Under the first phase of Kisan Urja Suraksha Evam Utthaan Mahaabhiyan (KUSUM) scheme that is to be launched by July 2018, the government will provide 2.75 million […] Read more