Mahanadi Coalfields Ltd Invites Bids for 2.5 MWp Rooftop Solar Plant Updated On Mon, Dec 12th, 2022 by Saurenergy Mahanadi Coalfields Ltd (MCL) has invited bids for the development of a 2.5 MW of grid-connected rooftop solar plant at the residential and non-residential buildings of MCL. The last date for submitting the bid for this Mahanadi Coalfields Ltd (MCL) 2.5 MW tender is January 03, 2023, till 05:00 pm, and bids will be opened […] Read more
GEDA Identifies 13 Offices of Goa Power Dept to Run on Solar Energy Updated On Fri, Apr 6th, 2018 by Saurenergy Six in South Goa and seven in North Goa will have grid connected rooftop solar plants. The Goa Energy Development Agency (GEDA) has identified 13 sub-division offices of the Goa electricity department that will be solar powered. Out of the thirteen sub-division offices, six in South Goa and seven in North Goa will have grid connected rooftop solar plants. GEDA has floated […] Read more