Gujarat Plans To Add 40MW By Solarising Govt Buildings Updated On Thu, Sep 26th, 2024 by Saurenergy The Gujarat Energy Development Agency (GEDA) has now planned to add 40 MW of new solar capacities by solarising its government buildings. In its one of the recent tenders, GEDA sought bidders who can form a Joint Venture with the government to install rooftop solar on government buildings. As per the mandate, the state nodal […] Read more
MAHAPREIT Invites Bids To Set Up 350 EV Charging Stations Updated On Thu, Mar 28th, 2024 by Saurenergy Maharashtra’s Public Sector Undertaking (PSU) Mahatma Phule Renewable Energy and Infrastructure Technology Ltd (MAHAPREIT) and a subsidiary of MPBCDC invited e-Tender to set up EV Charging stations. The tender invited an open e-tender through an online submission under Part I (Technical Bid) on behalf of MAHAPREIT, Mumbai for the empanelment of agencies to set up […] Read more
GEDA Releases Tender For 30 MW Rooftop Solar Project At Govt. Buildings Updated On Mon, Mar 11th, 2024 by Saurenergy Goa Energy Development Authority (GEDA) released a tender for 30 MW solar power project at (AC) rooftop solar PV plant on RESCO model at identified government buildings. The tender was released for the design, engineering, procurement and supply, erection, testing, commissioning and comprehensive operation and maintenance of the project for 25 years. The tender stated, […] Read more
SJVN Looks To Invest Rs 1300 Cr On Floating Solar In Goa Updated On Tue, Jan 23rd, 2024 by Saurenergy Government owned SJVN Green Energy Ltd (SGEL) has submitted a proposal to the state government of Goa under which it seeks to invest more than Rs 1,300 crore for the establishment of four floating solar projects in the western coastal state. The proposal holds that the total power generation capacity of the four floating solar […] Read more
KPI Green Energy Commissions 4.10 MW Wind-Solar Hybrid Power Project Updated On Fri, Aug 25th, 2023 by Saurenergy Surat-headquartered KPI Green Energy Ltd, the solar vertical of KP Group and a firm that produces renewable energy, KPI Green Energy has received commissioning certificates from Gujarat Energy Development Agency (‘GEDA’) for its 4.10 MW wind-solar hybrid power project. This entails a 2.10 MW wind and 2 MWdc solar project. The project is established at […] Read more
KPI Green Gets Commissioning Certificates from GEDA for 26.10 MW Hybrid Power Project Updated On Thu, Jun 8th, 2023 by Saurenergy Gujarat-based KPI Green Energy, which develops, builds, owns, operates, and maintains solar power plants as an independent power producer and captive power producer has announced receiving commissioning certificates from GEDA (Gujarat Energy Development Agency). The firm has commissioned 26.10 MW wind-solar hybrid power project. The hybrid project comprises of 16.10 MW capacity of wind while […] Read more
Goa CM Mulls Over Renewable Energy Expansion to 80 MW to Solarize Panaji Updated On Mon, Mar 20th, 2023 by Saurenergy The state of Goa requires producing 80 MW of renewable energy that may help the state government to make Panaji a solar city. This also needs to be substantiated with the efforts on the part of the people of Goa by installing more and more solar panels, believes Chief Minister of Goa, Pramod Sawant. Out […] Read more
GEDA Invites bid for 1.2 MW Solar Rooftop Plant Tender for District Hospital Updated On Mon, Dec 26th, 2022 by Saurenergy Goa Energy Development Agency (GEDA) has invited bids for 1.2 MW of grid-connected rooftop solar projects at North Goa and South Goa District hospitals, 600 KW for each. The last date to submit the bid is January 20, 2023, and the bids will be opened on the same day. This GEDA 1.2 MW of grid-connected […] Read more
CERC Rejects Windpower Windfarm’s Grounds for Failure to Commission Project Updated On Thu, Dec 15th, 2022 by Saurenergy A petition filed by Airpower Windfarms, contending that because the Gujarat Energy Development Authority (GEDA), refused to extend the developer permissions, it was unable to commission its project, has been turned down by the Central Regulatory Electricity Commission (CERC). The firm said that it was granted Stage-I Connectivity on 13.7.2018 and Stage-II Connectivity on 24.8.2018 […] Read more