Voltalia Wins a Mixed Photovoltaic and Battery Storage Power Plant in French Guiana Updated On Tue, May 11th, 2021 by Saurenergy Voltalia is the sole winner of the fifth period of the CRE 4 tender for non-interconnected areas for ground-based solar power plants in French Guiana. The project, called “Parc Sable Blanc”, combines a five-megawatt photovoltaic power plant with a lithium-ion battery storage facility with a capacity of 5 megawatts and of 9.3 megawatt-hours. Located in […] Read more