AMENDMENT-I, PPA & PSA : SELECTION OF SOLAR POWER DEVELOPERS FOR SETTING UP OF 150MW (50MW X 3) GRID CONNECTED FLOATING SOLAR POWER PROJECTS TO BE INSTALLED AT RIHAND DAM, UP Updated On Fri, Oct 12th, 2018 by Saurenergy This has reference to the RfS No. SECI/C&P/SPD/RfS/150MW FLOATING/UP/R1/092018 dated 06.09.2018 regarding “Selection of Solar Power Developers for Setting up of 150MW (50MW x 3) Grid Connected Floating Solar Power Projects to be installed at Rihand Dam (also known as Govind Ballabh Pant Sagar Reservoir), Sonbhadra District, Uttar Pradesh”. The pre-bid meeting for the subject tender has […] Read more