IRCON Renewable Power Invites Bids for 500 MW Solar Project in Karnataka Updated On Tue, Aug 30th, 2022 by Saurenergy IRCON Renewable Power (IRPL) has floated a tender for engineering, procurement, and construction (EPC) work with a 220 kV substation for 500 MW of grid-connected solar power projects at Pavagada in Karnataka. The last date for submitting the online bid is September 20, 2022, and the bids will be opened on the same day. This […] Read more
REIL Issues Tender for Setting UP 100 MW SPV Module Manufacturing Line Updated On Tue, Aug 30th, 2022 by Saurenergy A joint venture between the Government of India and the Government of Rajasthan, Rajasthan Electronics and Instruments Limited (REIL) issues tender/ has requested a bid to set up a 100 MW automatic solar module manufacturing line. This Automatic Solar Photovoltaic (SPV) module manufacturing line is on turnkey basis. Within seven months after the purchase order’s date, […] Read more
Mahindra Launches New Electric 3-Wheeler with Starting Price at Rs 3.60 Lakh Updated On Tue, Aug 30th, 2022 by Saurenergy Zor Grand, an entirely new electric three-wheeler from Mahindra Electric Mobility Limited (MEML), a member of the Mahindra Group, has been introduced recently. The vehicle’s starting price is Rs 3.60 lakh, ex-showroom Bengaluru. The innovative Li-ion battery technology used in the Zor Grand electric three-wheeler ensures a charging period of fewer than four hours and […] Read more
CEA Report: Prices for Polysilicon & Solar Modules Will Start to Fall in 2023 Updated On Tue, Aug 30th, 2022 by Saurenergy According to data by Clean Energy Associates (CEA), solar module prices for foreign markets are anticipated to decline in parallel with predicted decreases in polysilicon prices as of 2023. Due to higher-than-anticipated European purchase volumes and constrained polysilicon supplies, the quality assurance and supply chain management company disclosed that module costs that had gone up […] Read more
CEA Report: PV Price Forecasting Report (Q2 – 2022) Updated On Mon, Aug 29th, 2022 by Saurenergy CEA (The Clean Energy Association) has published a research report entitled “PV Price Forecasting Report (Q2 – 2022)”. Recent months have seen significant changes in the solar sector as a result of supply constraints, increased costs, and logistical difficulties as well as rising energy demand and geopolitical tensions. The PV Price Forecasting Report is a […] Read more
China-Based LONGi Ships 18GW+ of Modules in The First Half of the Year Updated On Mon, Aug 29th, 2022 by Saurenergy Leading manufacturer of solar modules, LONGi, based in China, has revealed financial figures for the first half of the year. As per the manufacturer, LONGi Green Energy, a member of the Solar Module Super League (SMSL), exported 39.62 GW of monocrystalline silicon wafers. Out of all, 19.47 GW were used internally and 20.15 GW were […] Read more
Indian Oil Releases Tender to Buy Land in Odisha for 10MW Solar Project Updated On Mon, Aug 29th, 2022 by Saurenergy To build a 10 MW solar project in Odisha, Indian Oil Corporation (IOCL) has released a tender for the sale of 50 acres of land. The last date for submitting the online bid is September 26, 2022, and the bids will be opened on September 27, 2022. Each interested bidder will have to pay Rs. […] Read more
Konkan Railway Corporation Floats Bid For 5 MW Solar Project Updated On Mon, Aug 29th, 2022 by Saurenergy Konkan Railway Corporation has issued a tender for inviting bids to set up a 5 MW grid-connected ground-mounted solar project. This solar project would provide solar energy for the 25 kV, single-phase, 50 Hz transmission system at Murdeshwar of the Konkan Railway in Karnataka for 25 years, as well as the necessary protection system. The […] Read more
Syngene Seeks 100% Green Energy With Another Green PPA With O2 Power Updated On Mon, Aug 29th, 2022 by Saurenergy Contract research and manufacturing firm Syngene International has announced that it has inked a pact to acquire an equity stake up to 26 per cent in O2 Renewable Energy II. The stake is picked up to maintain the captive status of the renewable energy project that O2 power will set up, as per regulatory norms […] Read more