SECI again Extended Bid Submission Date for 4MW Floating Solar plus BESS Tender Updated On Fri, Jun 19th, 2020 by Saurenergy In a series of extensions, the tender for 4 MW floating solar with 2 MW/ 1 MWh BESS in North Andaman has also sought extension once again. The Solar Energy Corporation of India (SECI), in its latest notification, has extended the bid submission deadline for its tender for the selection of solar power developers for […] Read more
3MW of Solar With Battery Storage Tendered by SECI in Ladakh Updated On Thu, Jul 12th, 2018 by Saurenergy The tenders have been issued on behalf of Military Engineer Service (MES), a construction agency. The tender is for design, engineering, supply, construction, testing, installation, and commissioning. In order to broaden the horizons of solar power in the country, Solar Energy Corporation of India (SECI), at two different locations in Jammu and Kashmir has issued […] Read more
China Gets Its First Modularized and Pre-installed Battery Energy Storage Power Plant Updated On Mon, Nov 6th, 2017 by Saurenergy TheModularized and Pre-installed Battery Energy Storage Power Plant is located inside the factory of Four Seas in Suzhou, and the scale of the project is 250KW/1MWH, which covers 45m2, and the expected life is 10 years. The Modularized and Pre-installed Battery Energy Storage Power Plant of Four Seas (Suzhou) Food Co., Ltd. made by Narada […] Read more
Trends That Shape India’s Energy Future Special Activities and Exhibitions at Intersolar India Updated On Sat, Nov 4th, 2017 by Saurenergy Intersolar India 2017 will be hosting and highlighting three special exhibitions: ees India, Power2Drive India and EnergyDecentral India. Solar is set to remain in the limelight in 2017 as the entire industry returns strong growth. India is expected to increase installed solar capacity to more than 17 GW by the end of 2017. Intersolar India […] Read more