balance of system (BOS) tender

NTPC Floats Tender for Supply of Battery Energy Storage System at Khavda RE Park

NTPC Renewable Energy Limited (NTPC REL) has invited online bids from eligible bidders on a Single Stage Two Envelope basis for a battery energy storage system (BESS) for solar PV-based construction power at NTPC Renewables Khavda RE park, Rann of Kutch, Gujarat. The last date for submitting the bid of this NTPC BOS tender is […]

Read more

NTPC Floats 1200 MW of BoS Tender for Solar Project in Kutch, Gujarat

National Thermal Power Corporation Limited (NTPC) Renewables has floated a balance of system (BOS) tender package for a 1200 MW (4 X 300 MW) solar project at Khavda RE power park, Rann of Kutch, Gujarat. The last date for submitting the bid of this NTPC BOS tender is January 09, 2023, till 03:00 pm and […]

Read more

NTPC Floats BOS Tender With Nominal Capacity of 1GW Wind Energy Project

National Thermal Power Corporation Limited (NTPC) has floated balance of system (BOS) tender package of an ISTS-connected wind energy project with a nominal capacity of 1000 MW anywhere in Karnataka.  The last date for submitting the bid of this NTPC BOS tender is December 19, 2022, till 03:00 pm and the bid will be opened […]

Read more
      SUBSCRIBE NEWS LETTER
Scroll