Azure Power Q2 Results. Not Enough To Enthuse Investors Updated On Mon, Dec 13th, 2021 by Saurenergy The NYSE listed Azure Power Global Limited announced its consolidated results under United States Generally Accepted Accounting Principles (“GAAP”) for the fiscal second quarter 2022, period ended September 30, 2021. Fiscal Second Quarter 2022 Period ended September 30, 2021 Operating Highlights: Megawatts (“MW”) Operating* were 2,210 MWs, as of September 30, 2021, an increase of 31% over September 30, 2020. […] Read more
Azure Power Signs PPA’s For 600 MW With SECI For Its 4 GW Mfg. Linked Projects Updated On Thu, Nov 18th, 2021 by Saurenergy Azure Power today announced that it has signed Power Purchase Agreements (PPAs) for 600 MW ISTS connected solar power projects with Solar Energy Corporation of India (SECI), under its 4 GW manufacturing linked projects, which will supply power for 25 years at a fixed tariff of INR 2.54 (~US 3.4 cents) per kWh. The projects will be constructed in […] Read more
Azure Power Wins its First 120 MW ISTS Wind Project with SECI Updated On Mon, Oct 25th, 2021 by Saurenergy Azure Power, one of the leading solar power developers in the country, has announced that it has received the letter of award (LOA) for its first wind project, 120 MW ISTS project with Solar Energy Corporation of India (SECI) to supply power for 25 years at a tariff of INR 2.70 per kWh. Azure Power’s […] Read more
Tariff Markdown on Manufacturing Tender. Unfair For Developers? Updated On Tue, Sep 21st, 2021 by Saurenergy Even as SECI continues to provide positive tidings in terms of finally finding buyers for the power from the manufacturing linked solar tender that has been pending since last year, the news of markdowns can’t be good for relevant stakeholders. Readers will recall that these tenders had a tough time finding takers for a long […] Read more
APTEL Accepts TPREL Claim For GST Compensation, After MERC Rejection Updated On Tue, Sep 21st, 2021 by Saurenergy In an interesting judgement uploaded yesterday, the Appellate Tribunal for Electricity (APTEL) has upheld an appeal filed by Tata Power Renewable Energy Limited (TPREL) against an order of the Maharashtra Electricity Regulatory Commission (MERC), on compensation for GST law changes. MSEDCL was the other party to the case, as the discom buying the power from […] Read more
SECI’s 1000 MW PSA Signing with TANGEDCO, Vital Step Forward For Mfg. Linked Tender Winners Updated On Mon, Sep 20th, 2021 by Saurenergy It says something for the dearth of good news we have had in the solar sector, that firms and even government bodies have taken to highlighting every step of the process from planning to tenders to winners to even the signing of PSA’s (power sales agreement) and PPA’s (Power Purchase Agreement) now. The backlog of […] Read more
Curtains Finally Coming Down On Andhra Solar Power Tussle? Updated On Fri, Sep 17th, 2021 by Saurenergy In a key development, the Andhra Pradesh state cabinet of Chief Minister Jagan Mohan Reddy has accepted an offer by SECI (Solar Energy Corporation of India) to supply solar power to the state. The state has plans to supply solar power to its farmers at Rs 2.49 per unit through its own agriculture feeder lines. […] Read more
SECI’s 1200 MW Tranche XI Wind Tender Sees Winning Bids at Rs 2.69/Unit Updated On Fri, Sep 3rd, 2021 by Saurenergy Wind Energy continues to charge up in 2021, with SECI’s Tranche XI tender attracting winning bids at Rs 2.69/unit. The winning firms this time were ReNew Power (300 MW), Sembcorp through its subsidiary Green Wind Infra Energy (180 MW), Evergreen Power through Anupavan Renewables (150 MW). Adani Green scooped up the largest parcel of 450 […] Read more
Azure Power Hopeful of No Price Markdowns As PSA’s Finally Start on Its 4 GW Mfg Linked Win Updated On Thu, Sep 2nd, 2021 by Saurenergy At an analyst call post its Q1 results for 2022-23, Azure Power CEO Ranjit Gupta expressed the hope that there will be no price markdowns on the winning bid rates, for its 4 GW tender manufacturing linked tender wins. Azure had won a total project capacity of 4 GW, even as Adani Green Energy won […] Read more